My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC. (2)
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:06:37 PM
Creation date
6/26/2023 3:56:46 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2023-088-07
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
1/1/2025
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
assure that the reasonable cross -falls are maintained for the new <br />roadway surface. For the portion of any roadway to be widened, <br />the key issue is to minimize the impacts to the existing properties <br />byjoining the existing grades at the right-of-way line as closely <br />as possible. As is the case in the rehabilitation areas, the survey <br />cross-section will be critical to the design of the widened curb and <br />new roadway cross -falls. <br />Signing and Striping Plans <br />Signing and striping plans will be prepared at 40-scale showing <br />the replacement of existing striping, raised pavement markers <br />and pavement markings. New signing, striping and pavement <br />markings, including the bicycle lane, will also be shown. The <br />plans will show all driveways, curbs, medians and other features <br />that affect turning movements. The plan will include general, <br />construction notes, and other details necessary to construct the <br />proposed signing and striping and will detail thejoining of the <br />proposed signing and striping features with those existing on <br />either side of the project limits. Signing and striping features will <br />be designed in accordance with the 2014 California Manual on <br />Uniform Traffic Control Devices and the 2015 Caltrans Standard <br />Plans. <br />Landscape/Irrigation <br />The landscape architectural construction documents will be <br />prepared to meet the City prescribed standards including the <br />City's Parkway Improvement Guidelines. Planting and irrigation <br />plans will comply with current water conservation standards. <br />Drainage <br />We have assumed that there are no drainage facilities (existing or <br />proposed) within the project limits. <br />Traffic Control <br />We have assumed that traffic control plans will not be prepared by <br />our team but will be addressed in the project specifications with <br />construction phasing specified in a manner that minimizes traffic <br />disruption, public inconvenience and lost work time. Detailed traffic <br />control plans will be prepared by the contractor, which will detail <br />each phase of construction including construction work hours, <br />maintenance of pedestrian facilities, access to businesses, and <br />emergency vehicle access. The location of construction signs, <br />barricades, delineators and flashing arrow signs will also be <br />detailed on the plans. The contractor -prepared traffic control plans <br />will be prepared in accordance with the most current MUTCD. <br />Meetings <br />Regularly scheduled meetings are a key to keeping projects <br />on schedule, avoiding pitfalls, and keeping the lines of <br />communication open with the City so that surprises do not occur <br />during the final stages of the project. We anticipate monthly PDT <br />meetings throughout the duration of the project. <br />Project Management/ QA/QC <br />The Project Management task is directed at the organization, <br />planning and control of the project team. Activities include <br />scheduling and monitoring of the project team, cost control and an <br />active quality control program. Quality Control will be an ongoing <br />task throughout the duration of the project. <br />The anticipated plan set will consist of the following sheets: <br />Description <br />Title Sheet <br />1 <br />T ical Sections and Details <br />1 <br />Roadvdd y Plan and Profile 20-scale <br />2 <br />Signing and Stripinq <br />1 <br />Landsca e/Irri ation <br />5 <br />Cross Sections <br />1 <br />Total Sheets: <br />11 <br />PHASE 3: BIDDING STAGE <br />During the bidding stage of the project, Ardurra will assist the <br />City in answering questions from contractors, and prepare any <br />addenda that may be required. Ardurra will also attend the <br />pre -bid conference andjob walks as necessary. Once the bids <br />are received, we will assist the City in analyzing the bids and <br />providing recommendation for award. <br />PHASE 4: CONSTRUCTION STAGE <br />During the construction phase of the projects, Ardurra will typically <br />provide the following services on an as -needed basis: <br />■ Respond to RFls <br />■ Visit site for progress and conformance to PS&E <br />■ Interpret plans and specifications as necessary <br />■ Analyze changed field conditions <br />■ Prepare revisions to plans as necessary <br />■ Review shop drawings and other required submittals <br />■ Prepare "as -built' drawings <br />Schedule <br />A sample schedule is provided on the following page. <br />3. FEE PROPOSAL <br />Hourly rates are enclosed in a separate sealed envelope and <br />separate electronic file, per RFP requirements. <br />4. CERTIFICATIONS <br />The Non -Collusion Affidavit, Non -Lobbying Certification, and <br />Non -Discrimination Certification forms are attached in Appendix A. <br />City of Santa Ana I March 14, 2023 <br />On -Call Engineering Services, RFP No. 23-030 <br />/�/ARDURRA <br />
The URL can be used to link to this page
Your browser does not support the video tag.