My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WILDAN ENGINEERING
Clerk
>
Contracts / Agreements
>
W
>
WILDAN ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:07:59 PM
Creation date
6/26/2023 3:59:26 PM
Metadata
Fields
Template:
Contracts
Company Name
WILDAN ENGINEERING
Contract #
A-2023-088-09
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
11/9/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />• Issue addendum to bid documents to answer questions raised, if required <br />Task 7 — Preconstruction and Job Site Meetings - Option A and Option B <br />Willdan will attend the preconstruction meeting, job walk, and job- © Task 7 Deliverables <br />site meetings, as required, over the course of construction. Willdan .Meeting minutes <br />assumes one preconstruction meeting and three job site meetings. <br />Task 8 - Respond to Requests for Information and Submittals - Option A and Option B <br />Willdan will provide responses to contractor's requests forTask <br />8 Deliverables <br />information about the plans and specifications. This task includes <br />• Log requests for information and provide responses <br />conferring with the City's construction manager, as appropriate, <br />• Field design recommendations <br />regarding the requests to address unforeseen site conditions and/or <br />• Field meeting minutes <br />provide field design recommmVations. Regularly scheduled <br />• Design details <br />construction observation is specifically excluded from this scope of work. <br />Up to 10 responses to requests for information are included in <br />the scope. <br />Task 9 — Prepare Record Drawings/As-Builts - Option A and Option B <br />Within 60 days following completion and acceptance of the project, <br />Task 9 Deliverables <br />Willdan will furnish the City with a complete set of revised original <br />tracings showing as -built conditions on Mylar. Revisions will be solely <br />One complete set of original record drawings on Mylar, <br />based upon as -built information provided by the City's construction <br />one electronic PDF copy, and one Microstation V8i <br />manager and the contractor. <br />VQ- <br />Comprehensive. Innovative. Trusted. <br />a.0, <br />Proposal for On -Call Engineering, <br />RFP No. 23-030 <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.