My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WILDAN ENGINEERING
Clerk
>
Contracts / Agreements
>
W
>
WILDAN ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:07:59 PM
Creation date
6/26/2023 3:59:26 PM
Metadata
Fields
Template:
Contracts
Company Name
WILDAN ENGINEERING
Contract #
A-2023-088-09
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
11/9/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Schedule/Timeline to Complete the Project <br />D Trze rvame Duration V.t Fmm " a M a luI. w9 Te Sri a an'1e rw'Fe orc <br />__-- as t .I 2 y x <br />IiOption ASchedule 115 days Tue6/5/]e Mon ll/12 <br />1 PROJECT MANAGEMENT 0days Tue 615118 Tue6/5118 6/5 <br />AGENCY&UTINTYCOORDINATION 25 days Tue6/5/18 Mon 7/9/18 <br />3 ENVIRONMENTAL COMPLIANCE AND PERMIT OS days Tue 615/18 Mon 8/6/18 <br />PRELIMINARY ENGINEERING Mdays Tue6/5118 Moo)/9/18 <br />5 site Visit 2days Tue6/5/18 Wed 6/6/18 <br />6 Told Survey to time Tue6/5/I8 Mon 6/18/18 <br />emeechniounvesQuon 10days Tue 6/5/18 Mon 6/18/1a <br />8 Preliminary Design Report 5tlays Tue 6/19/18 Mon 61 <br />9 City Review of Preliminary Design Report to days Tue 6126/18 Mon)/9118 <br />In PLAN PREPARATION )D days Tue7/1O118 Mun 1O1WI <br />u 30% Plans and Estimate 15 days rue)/10118 7/30/11 <br />Il City Review laar3a%eansuad on Estimate <br />Documents to on,on, Tue)/31/18 Mon 9/3118 <br />IS 6O%Plans, SpeciOnHons and Estimate 15 days Tue 811O/I8 Mon 9/3/IB <br />la City Review of60% Construction Documents to days Tue 9/0/18 Mon 9/1)/1 <br />6 100%Plan, Sped@aborts and Estimate 10 days Tue 9118118 Mon TWO <br />16 City Review of 100% ConstmNnn Dotumen6 10 do, Tue 1O/2/I8 Mon 10115/ <br />IT CONSTRUCTION BIDDING PHASE SERVICES 2O days Tue 10/16/1LMon 11/12/1 <br />IR 'PRE-COMMUCTION MEETING AND I08-1ITE adays Mon Mon 11/ut <br />MEETINGS 11/12/16 11/12/19 <br />I9 'RESPOND TO REQUESTS FOR INFORMATION AND adays Mon Mon 11/12 <br />SUBMITTALS 11/12119 11/12/18 <br />In 'PREPARE RECORD DRAWINGS IASRUILTSI adays Mon ll/I2/]Mort 13/12/1 t 1=2 <br />ink asm�l--MCN"""i 1 I art 'so' <br />5P4r Manuel To. ra-va sumsne ry <br />Project Santa Ana 01 MtleNane • assay l� wwurc <br />Proposal, RFP No, 17-083 svmmmy n oeu asva wy nam <br />e impress <br />Option A Schedule awpo Summary Y"-"� Manua Summery �1 ManuL warfarepvdvn Tara in. any c <br />timmaeaaanme FiamonH ] <br />0 Option B Schedule ISO days Tue6/5/1B Man 12/3/18 <br />1 PROJECT MANAGEMENT Dtlays Tue fi/5/18 Tue 6/5/18 Big <br />AGENCY& UTILITY MORDINATON Mdays Tue 6/5/1B Mon Wife . <br />3 ENVIRONMENTAL EOMWANCE AND PERMIT 15 days Tue iii Mon B/15118 li <br />PRELIMINARY ENGINEERING 3a it., Tue6/5/18 Mon 7/16/111 <br />5 site Visit 2days Tue 6/5/18 Wetl iii <br />Field Survey 15 tlays Tue 615/18 Mon 6/25/18 <br />Gmnalloical Investigation 15 days Tue6/5118 Mon 6/35/18 <br />Preliminary bri Report 5tlays Tue6/26118 Mw)/211B <br />9 0, Review of Fran inary Design Report la days Tue)/3/M Mon)/11118 <br />to PLAY PREPARATION W tlays Tue T/1)/18 Mon 1115119 j <br />11 30%Plans andReview of EitimatSMCoe 20 days Tue)/1)/18 Mon B/13/18 <br />tx Cry Review of 3cM Construction Documents TO days Tue a/14/18 Man 8/27/18 <br />13 60% Plans, Specifications and Estimate 2O tlays Tue 8/28/18 Mon 9/24118 <br />ID [Iry Review of BG%Conevudian Documents ]Dtlays Tue 9/IS/18 Mon 1O/8/10 <br />IS ��I UNA, Plans, SpecifiraUoru and Estimate 1O days Tue 10MI18 an W/23/18 <br />6pry Review of IDe6 Construction Documents to it Tue 1O/23119 Mon 11/5/la <br />.1 <br />11 CONSTRUCTION BIDDING PHASESERVICES 2O tlays Tue 11/i Mon 33A/18 <br />18 'PRE{ONSTRUMONMMNGANDJO&SOE 0days Man IWAS Mon:2M 12/3 <br />MEETINGS <br />19 'RESPOND TO REQUESTS FOR INFORMATION AND Gdays Man 12/3/18 As l)Ji/]e W3 <br />SUBMITTALS <br />24 'PREPARE RECORD DRAWINGS MS-0URYO Do,, Mon IV3118 Mon 1213118 •12/3 <br />r vnm mmry 1 1 OumaltarM —.e aCO T."we <br />eat ............. MvmN Tne fneml wlnm.a o <br />Prefer Sine Ma On .11 w. • 0"" say ..a - <br />Proposal, RFP No. 174H `vrv. (-1 Fri 1, Y.A. Pm, - <br />option 85 etlule ormivmmary I— -1 assi as, g1 Mvrvais'. <br />.p ] <br />Page I <br />Fee Proposal <br />Per the City's Request for Proposal, the fee proposal has been uploaded to PlanetBids and submitted under separate sealed <br />envelope. <br />Proposal for On -Call Engineering, 23 <br />- ;a Comprehensive. Innovative. Trusted. RFP No. 23-030 ti: a <br />
The URL can be used to link to this page
Your browser does not support the video tag.