My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP, INC. (6)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:18:27 PM
Creation date
6/26/2023 4:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP, INC.
Contract #
A-2023-088-12
Agency
Parks, Recreation, & Community Services
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
5/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I On -Call Engineering Services <br />RFP NO.: 23-030 <br />City of Orange Water Division I Warehouse Relocation <br />Orange, California <br />_, <br />The IDS team is currently providing engineering <br />design services for the replacement and relocation <br />of the City of Orange Water Division warehouse. <br />The existing warehouse location is now home <br />to the City's new Fire Department Headquarters <br />located at 105 South Water Street. The warehouse <br />will be relocated to 1130 E. Almond Avenue. <br />Warehouse Key Elements: <br />• 5,000 sf building built on the southeast portion <br />of the Water Division's existing yard on <br />E. Almond Avenue <br />• The covered structure over the outdoor <br />materials for asphalt, backfill, gravel, and <br />spoils will be in compliance with the National <br />Pollutant Discharge Elimination System <br />(NPDES) <br />• Essential Service <br />Facility <br />• Civil Engineering <br />• Land Surveying <br />• Grading Plan <br />• Vehicular <br />Circulation Plan <br />• Water Quality <br />Management <br />Report <br />• Specifications <br />• Structural <br />and Electrical <br />Engineering, <br />Architectural <br />Design Services <br />• Cost Estimates <br />Construction <br />Documents <br />Key Staff: Adrian Anderson, Jason Wetterich, <br />Joyeuse Dufitumukiza, Matthew Michnewich, Victor <br />Mercado, Bob Kramer, MannyOcampo, JohnSilber, <br />and Song Brandner <br />Project Dates: 2020 - on -going <br />Contract Amount: $260,258 <br />Client Reference: <br />City of Orange <br />Jeannette Guereca, PE <br />City of Orange <br />Phone: (714) 744-5525 <br />Email: jguereca@cityoforange.org <br />• The covered structure will be designed to <br />address water pollution by regulation at the <br />point source and minimizing erosion runoff <br />into the storm drain system. <br />A k IDS GROUP Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.