Laserfiche WebLink
City of Santa Ana I On -Call Engineering Services <br />RFP NO.: 23-030 <br />Riverside Drive Street Rehabilitation and ADA Ramps <br />IDS provided civil engineering and land surveying <br />services to assist the city in their efforts to rehabilitate <br />approximately one mile of Riverside Drive between Fair <br />Oaks Avenue and Central Avenue. <br />The civil engineering team was responsible for preparing <br />street improvement plans to construct over sixty (60) <br />directional ADA ramps at eight (8) intersections and <br />rehabilitation of approximately four thousand linear feet <br />of Riverside Drive using a combination of grind & overlay <br />and removal and replacement. The 40-page plan set <br />included enlarged intersection paving detail sheets, <br />enlarged individual ramp detail sheets, plan and profile <br />sheets, typical cross section sheets, and signing and <br />striping sheet. <br />Pipeline Avenue and Ramona Street Rehabilitation and ADA Ramps <br />IDS provided civil engineering and land surveying services <br />to assist the city in their efforts to rehabilitate portions of <br />Pipeline Ave and Ramona Ave and construct new access <br />ramps in the City of Chino. <br />The scope of work included collection of field data and <br />topographic and boundary survey mapping. IDS survey <br />crew was responsible for the collection of field data using <br />9 <br />conventional survey methods and our office survey team <br />was able to prepare a topographic base map survey . r.7� <br />which allowed for the design and preparation of street <br />improvement plans. Additional responsibilities included <br />perpetuating existing centerline monuments, setting <br />accessory monuments, and filing records with the County <br />Surveyor's office. <br />IDS' civil engineering team was responsible for preparing street improvement plans to <br />construct over thirty (30) directional ADA ramps at seven (7) intersections and rehabilitate <br />portions of the existing street where necessary. The plan set included enlarged individual <br />ramp detail sheets, typical cross section sheets, and signing and striping sheets. <br />Key Staff: Nathan Kerstiens <br />Project Dates: 2017 - 2020 1 Contract Amount: $153,749 <br />Client Reference: City of Chino I Ms. Karen Campbell, Project Manager <br />Phone: (909) 334-3250 1 Email: kampbell@cityofchino.org <br />A, IDS GROUP Page 19 <br />