My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC. (4)
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:19:09 PM
Creation date
6/26/2023 4:12:12 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC.
Contract #
A-2023-088-13
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
9/1/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Call Engineering Services <br />Area 6 Slurry Seal and Overlay Project <br />Diamond Bar. CA <br />TAIT & Associates was selected by the City of Diamond Bar to provide design <br />engineering services for the Citywide Zone 6 Slurry Seal and Overlay Project. <br />The project included the design of an entire neighborhood zone within the <br />City of Diamond Bar which included the field identification, implementation, <br />and design of over 800,000 SF of AC Grind and Overlay, and 1,200,000 SF of <br />Slurry Seal located within the northern limits of the City of Diamond Bar. In <br />addition to the pavement analysis, design, and implementation, TAIT was <br />also responsible for identifying sidewalk, curb and gutter, and curb ramp <br />improvements throughout the neighborhood including the removal and <br />replacement of 19 curb ramps within the steep, curvilinear streets of <br />Diamond Bar. Special attention was paid on this project to the appropriate <br />use and identification of patching areas in order to maximize the City's <br />budget and to ensure constructability of the project. TAIT worked closely <br />with City staff to identify and isolate areas of concern in order to ensure the <br />City's benefits were maximized on the job. Of notable interest on this <br />project was the removal and replacement of speed cushions throughout <br />Sunset Crossing which would not be compatible with the installation of an <br />edge grind and overlay. Additionally, careful attention was paid to the <br />presence of existing utilities to ensure the proposed roadway treatment was <br />taking in to account the required adjustment (for overlay) and protection <br />(for slurry seal) work items. <br />Campus Drive Pavement Rehabilitation Project <br />Irvine, CA <br />TAIT was selected by the City of Irvine to provide civil engineering and <br />surveying on the Campus Drive Rehabilitation Project from Michaelson Drive <br />to University Drive. The project limits include a total of 4000 linear feet of <br />arterial roadway rehabilitation and reconstruction on Campus Drive which is <br />a 2 lane arterial roadway with bike lanes extending through the City of Irvine. <br />The project includes the design of pavement rehabilitation strategies as well <br />as the identification and replacement of non-ADA compliant curb ramps, <br />sidewalk, replacement of damaged curb and gutter, reconstruction and re- <br />grading of the low point of the roadway due to flooding and ponding issues, <br />coordination with IRWD and UCI for right of way and wetlands protection, <br />and the identification and adjustment/protection of utility facilities <br />throughout the project limits. Careful attention was paid to the roadway <br />profile which required modification in order to raise the low point of the <br />roadway by more than 6". Plan and profile for the roadway was re -designed <br />per CA Highway Design Manual standards, and extensive coordination with <br />conducted with the City to verify that the pavement replacement scenario is <br />in line with the proposed and revised grades. <br />1IITAIT <br />Reference: <br />John Beshay, Former <br />Associate Engineer <br />(626) 960-4011, Ext: 459 <br />Key Staff: <br />PIC: Jacob Vandervis <br />PM: David Sloan <br />QA/QC: Todd Schmieder <br />Client: <br />City of Diamond Bar <br />Construction Cost: <br />$1.5 M <br />Design Cost: <br />$46,750 <br />Project Dates <br />Design: Winter/Spring, 2018 <br />Construction: Summer, 2018 <br />Reference: <br />Darrell Hartman, PE <br />(949)724-7556 <br />Key Staff: <br />PIC: Jacob Vandervis <br />PM: David Sloan <br />QA/QC: Todd Schmieder <br />PE: Chris Engelbach <br />Client: <br />City of Irvine <br />Construction Cost: <br />$2.6 M <br />Project Dates: <br />Design: 2017-2018 <br />Construction: 2018 <br />Page 1 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.