TAIT & Associates, Inc. <br />On -Call Engineering Services <br />2. SCOPE OF SERVICES AND SCHEDULE <br />Sample Outline Scope of Services - <br />Phase 1: Base/Preliminary Data Review <br />1.1: Preliminary Photographs <br />1.2: Project Base Data and Design Field Review <br />1.3: Topographic Survey and Base mapping (Including Control/Aerial/Boundary) <br />1.4: Utility Coordination and Notices <br />1.5: Utilities Potholing (As Needed) <br />1.6: Outside Agency Coordination & Approvals (Federal/Rail/Utility/Adjacent Agencies) <br />Phase2: Pavement Analysis, Preliminary Engineering (30%), & <br />Reccomendations <br />2.1: Geotechnical/Pavement Investigation (GMU Geotechnical Sub -Consultant Task) <br />2.2: Preliminary Roadway/Geometric Study & Impact Review/Pricing [larger roadways] <br />2.3: Pavement Design Scenario Pricing and Recommendations [rehab/standard projects] <br />2.4: Preliminary Water Quality Management Plan (BMP Design & Recommendations) <br />2.5: Preliminary Roadway Hydraulic Studies & Recommendations <br />2.6: Colored Improvement Renderings (for council/commission reviews — as needed) <br />Phase 3: Environmental Review (Additional Sub -Consultant Task if <br />Needed): <br />3.1: Categorical Exclusion (CE) [Typical level of environmental support needed] <br />3.2: Initial Study/Mitigated Negative Declaration (IS/MND) [if not CE Project] <br />3.3: Further Environmental Study & Investigation (As Needed) <br />Phase 4: Design Plans, Specifications, and Estimates <br />4.1: Construction Drawings (60%, 90%, & 100%Typical) <br />4.1.1—Title Sheet <br />4.1.2 — Typical Cross Sections/Details <br />4.1.3 — Utility Composite Plan (Arterial/Major Projects) <br />4.1.4 — Roadway Improvement Plans (Plan or Plan & Profile Base on Needs) <br />4.1.5 — Drainage Improvement Plans (As Needed — Plan & Profile) <br />4.1.6 — Irrigation and Landscape Plans (As Needed SubTask— Arterials) <br />���TAIT p�'� <br />