My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF CONSULTING ENGINEERS (4)
Clerk
>
Contracts / Agreements
>
K
>
KPFF CONSULTING ENGINEERS (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:20:19 PM
Creation date
6/26/2023 4:15:22 PM
Metadata
Fields
Template:
Contracts
Company Name
KPFF CONSULTING ENGINEERS
Contract #
A-2023-088-15
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A more detailed scope of work will be provided when/if a specific project or Task Order <br />proposal is requested of a consultant. All tasks orders shall include the staff title, hours, hourly <br />rate and totals as related to the project. <br />Construction Plans, Standard Specifications and Estimate (PS&E) <br />Preliminary Design - Attend project scope meeting with City Staff to review project details. <br />Consultant shall field review, inspect and conduct all necessary surveys to prepare a Preliminary <br />Design Report (PDR) or alternatives, preliminary cost estimate and preferred alternative as <br />requested by the project manager. <br />A (PS&E) package shall be submitted to review at 30% design for independent City review. <br />A (PS&E) package shall be submitted to review at 60% design for independent City review. <br />A (PS&E) package shall be submitted to review at for FINAL independent design review. <br />The City will review and comment on the PS&E packages with a turnaround goal of (2) weeks. <br />One (1) copy of the documents with comments will be returned to the consultant. Unless, several <br />agencies are involved in the review process multiple documents with comments will be provided <br />to the consultant. <br />After the final design comments have been incorporated the consultant shall provide the City <br />with final (PS&E) package ready forbid. See Section - General Requirements and Project <br />Deliverables Section. <br />Project Schedule and Progress: <br />Progress review meetings shall be held at intervals deemed appropriate by the City. The <br />Consultant shall furnish two copies of all completed work or partially completed update/status <br />since the last progress review meeting. Progress reports shall be submitted monthly in electronic <br />format indicating achievements and project schedule progress. <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the required <br />information in the RFP. The City will provide only the staff assistance and the documentation <br />specifically in referred to herein. <br />Furnish scope of work and provide general direction as needed for the assigned project <br />All plan check coordination within the City <br />Advertise, award, and administer of construction contract <br />Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards) <br />Electronic files for title sheets and sheet borders <br />• Facilitate meeting space and coordination and City facilities <br />City of Santa Ana RFP 23-030 <br />Page Al-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.