My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CLANTON & ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
C
>
CLANTON & ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:40:14 PM
Creation date
6/28/2023 4:03:25 PM
Metadata
Fields
Template:
Contracts
Company Name
CLANTON & ASSOCIATES, INC.
Contract #
A-2023-116
Agency
Public Works
Council Approval Date
6/20/2023
Expiration Date
6/19/2025
Insurance Exp Date
2/5/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Team <br />Dane Sanders, PE, LEED AP I President I dane@clantonassociates.com <br />Principal -in -Charge, Project Manager <br />Dane joined Clanton & Associates, Inc. in 2002. With strong design and technical <br />skills in lighting, daylighting and controls, Dane approaches challenging projects with <br />inspired and innovative designs. <br />Project Experience: <br />Salt Lake City Lighting Master Plan <br />City of South Salt Lake Lighting Master Plan <br />City & County of Denver Street Lighting Desigti Guide <br />Percentage of Time on Project: 15% <br />Annie Kuczkowski, PE I Associate I annie@clantonassociates.com <br />Annie is a project manager with experience in developing lighting and small cell <br />guidelines, development of energy codes, designing public service lighting, along with <br />lighting for streetscapes, transportation facilities, tunnels, and office buildings. She is <br />adept at working with city officials, stakeholders and manufacturers in a collaborative <br />way to analyze and balance needs of each party, often with conflicting desires. <br />Project Experience: <br />• City and County of Denver Small Cell Infrastructure Design Guide, Denver, CO <br />• City and County of Denver Street Lighting Design Guidelines, Denver, CO <br />• California Energy Commission, Title 24-2022, CA <br />Percentage of Time on Project: 5% <br />Rick Utting I Outdoor Lighting) rick@clantonassociates.com <br />Rick Utting provides guidance on issues related to Outdoor Lighting for Clanton & <br />Associates. Focused on pedestrian vision and the environmental sustainability of <br />outdoor lighting, Rick serves the Illuminating Engineering Society (IES) as Vice Chair <br />of the Outdoor Nighttime Environment Committee. <br />Project Experience: <br />Los Alamos County Lighting Ordinance, Los Alamos, NM <br />Pitkin County Outdoor Lighting Code, Pitkin County, CO <br />Aspen Outdoor Lighting Ordinance, Aspen, CO <br />Percentage of Time on Project. 10% <br />
The URL can be used to link to this page
Your browser does not support the video tag.