My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
J SMITH & T MULI, INC. (2)
Clerk
>
Contracts / Agreements
>
J
>
J SMITH & T MULI, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:39:43 PM
Creation date
7/3/2023 9:47:14 AM
Metadata
Fields
Template:
Contracts
Company Name
J SMITH & T MULI, INC.
Contract #
A-2023-115
Agency
Public Works
Council Approval Date
6/20/2023
Expiration Date
6/19/2026
Insurance Exp Date
4/29/2024
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
perimeter and water surface elevation at 25ft interval around the lake perimeter at the water surface. The survey <br />team will conduct the hydrographic survey on a 20ft-25ft grid using a boat mounted sonar. <br />JS&TM will perform a detailed aquatic vegetation mapping of existing vegetation present within Carl Thornton Park <br />Lake. The mapping effort will identify and map (locate) aquatic vegetation within the lake footprint. <br />Deliverable: JS&TM will prepare a ift contour interval map of the project area of the park. This map will be used as <br />the base map forthe project construction drawings and exhibits. The construction plan set will include a sheet named <br />Existing Conditions. This sheet will be prepared from the topographic survey. JS&TM will prepare a lft contour <br />interval bathymetric map of the lake within the concrete lake edge boundary. This map will be included in the Lake <br />Condition Assessment Report as an exhibit for the Sediment Analysis discussion. JS&TM will prepare an Aquatic <br />Vegetation Map that will be included in the Lake Condition Assessment Report. <br />Task 4: Lake Liner System Design <br />JS&TM will design a liner system for Carl Thornton Park Lake. The existing lake has a plastic liner that historically <br />exhibits classic liner "elephants" or "ballooning" due to trapped gases beneath the liner that cause section of the liner <br />to float. Carl Thornton Park historically has a high water table. JS&TM will design the appropriate liner system based <br />upon data gathered from the hydrogeologic and geotechnical investigations in Task-1. A clay liner is preferred and far <br />superior to a plastic liner, but the high groundwater may be prohibitive to the construction of clay liner. Alternatively, <br />JS&TM will design a plastic liner system if a clay liner system is not feasible at Carl Thornton Park. The soil analysis <br />results will be used to develop design recommendations for reconstruction of the lake liner as determined from the <br />water balance/seepage loss calculations and the hydrogeologic analyses performed in Task-1. <br />Deliverable: JS&TM will design the appropriate lake liner system for Carl Thornton Park Lake. The lake line <br />recommendations and design parameters will be included in the Lake Rehabilitation Study Report prepared in Task- <br />5. Construction drawings, plans and specifications will be prepared for the recommended lake liner system and <br />included in the lake construction documents. <br />Task 5: Evaluation and Recommendations Report <br />JS&TM will prepare a Lake Rehabilitation Study Report which will serve as a compilation report for the proposed <br />improvements to Carl Thornton Park Lake. The report will include documentation of each element of the lake study <br />including project background, project goals, City staff input, existing facilities, identified constraints, the <br />recommended rehabilitation plan, preliminary design of each lake system (water quality, lake liner, aeration, <br />circulation, water features, fishery/wildlife enhancements, etc.), cost estimates, CEQA compliance and permitting, <br />lake management guidelines, and technical appendices. This reportwill document research and investigation findings, <br />preliminary design assumptions, guidelines, and criteria developed during the preliminary design process. The <br />anticipated Table of Contents of the report is provided below: <br />• Synopsis <br />• Background <br />• Project Goals and Objectives <br />• Existing Condition of Thornton Park Lake <br />o Identified Deficiencies <br />o Lake Condition Assessment <br />• Recommended Rehabilitation Plan <br />o Aeration System <br />Thornton Park Lake Circulation Study and Renovations Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.