My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-07-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Agenda Packet_2023-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:10:15 PM
Creation date
7/12/2023 11:48:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
7/18/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Approve an Appropriation Adjustment and Award a Construction Contract to M.S. <br />Construction Management Group in the Amount of $428,420 for the Project W-Bus <br />Shelter, with an Estimated Project Delivery Cost of $535,525 (Project No. 22-6999) <br />(General Fund) <br />Department(s): Public Works Agency <br />Recommended Action: 1. Approve an amendment to the FY 2023-24 Capital <br />Improvement Program to include $282,053 in construction funds for the Project W-Bus <br />Shelter (Project No. 22-6999). <br />2. Approve an appropriation adjustment recognizing $114,000 in FY 2023-24 in <br />Senate Bill 1, Solutions for Congested Corridors Program (SCCP) grant funds in the <br />Selected Street Construction, State Grants -Indirect revenue account, and appropriate <br />the same amount to Select Street Construction, Improvements Other Than Building <br />expense account. (Requires five affirmative votes) <br />3. Award a construction contract to M.S. Construction Management Group, the lowest <br />responsible bidder, in accordance with the base bid in the amount of $428,420, <br />subject to change orders (not -to -exceed 25% of the base bid) in accordance with the <br />Greenbook: Standard Specifications for Public Works Construction, for the <br />construction of the Project W-Bus Shelter, for a term beginning July 18, 2023, and <br />ending upon project completion, and authorize the City Manager to execute the <br />contract subject to non -substantive changes approved by the City Manager and the <br />City Attorney. <br />4. Approve the Project Cost Analysis for a total estimated construction delivery cost of <br />$535,525, which includes $428,420 for the construction contract, $42,842 for contract <br />administration, inspection, and testing, and a $64,263 project contingency for <br />unanticipated or unforeseen work. <br />5. Determine the recommended actions are exempt from further review in accordance <br />with the California Environmental Quality Act as Categorical Exemption Environmental <br />Review No. ER-2021-182 was filed for the project. <br />20. Approve Agreement with SYRUSA Engineering, Inc. to provide Preconstruction <br />Engineering Services for the Fairview Bridge Replacement and Street Improvements <br />from 9th Street to 16th Street in an Amount Not to Exceed $285,620 for a Three -Year <br />Term (Project No. 15-6827) (Non -General Fund) <br />Department(s): Public Works Agency <br />Recommended Action: Authorize the City Manager to execute a consultant <br />agreement with SYRUSA Engineering, Inc. to provide Preconstruction Engineering <br />Services for the Fairview Bridge Replacement and Street Improvements from 9th <br />Street to 16th Street in the amount of $259,659, with a contingency of $25,961, for a <br />total amount not to exceed $285,620, for a three-year term beginning July 18, 2023, <br />and expiring July 17, 2026, with an option for one two-year extension, subject to non - <br />substantive changes approved by the City Manager and City Attorney (Agreement No. <br />2023-XXX). <br />City Council 12 7/18/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.