My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Residential Street Repair Program FY 2022-23
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Item 17 - Residential Street Repair Program FY 2022-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 5:02:57 PM
Creation date
7/12/2023 12:10:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
17
Date
7/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Exhibit 2 <br />PROPOSAL <br />PROJECT NO.: 23-7543 <br />RESIDENTIAL STREET REPAIR PROGRAM FY 22-23 <br />Item Description Qty Unit Unit Price Amount <br />14 Adjust Water Valve Frame & 7 I CA $ � ,� oO $/ 5 /00 <br />Cover to Finished Gcade , 1 1 <br />15 Adjust Sewer Cleanout Frame 3 EA $ $ <br />°2 00 601 u 00 <br />and Cover toFinished Grade <br />16 Project Advertisement Sign I CA06 <br />17 Signing and Striping 1 LS $ $ <br />o q8, q.20 <br />18 1 Construction Permit I LS $6,300 $6,300 <br />19 Stamped PCC Pavement 53 CY $ $ <br />(Including Rebar) 1300 <br />�(p gl 900 <br />20 PCC Concrete Band 4 � CY $ $ <br />;21 000 <br />(Including Rebar) <br />TOTAL BASE BID t11 WIL, 000- DO <br />The lowest responsible bidder shall be selected based on the total base bid. The City rese►•ves the <br />►•fight to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This hid item shall not be <br />subject to the 4'25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />i This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME -FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work f'or the total base bid amount <br />shown above, within number (45) working days after the commencement date stated in the <br />Notice to Proceed. <br />The liquidated damages anloUllt, ill lien of the alnoullt specified ill Subsection 6-9 of the <br />Standard Specifications, shall be $2,500 per- calendar- day. <br />P-2 of P- 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.