My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - New Water Well Drilling at Washington Site
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Item 18 - New Water Well Drilling at Washington Site
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 11:38:44 AM
Creation date
7/12/2023 12:15:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
7/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Exhibit A <br />PROPOSAL <br />PROJECT NO.: 19-6423 <br />WASHINGTON WELL IMPROVEMENTS <br />WELL DRILLING (PHASE 1) RE -BID <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Best Drilling and Pump, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Descri tion <br />Mobilization & Demobilization <br />including Noise Attenuation Panels <br />NPDES Discharge Compliance <br />Conductor (Surface) Casing <br />Qty <br />1 <br />1 <br />52 <br />Unit <br />LS <br />LS <br />FT <br />$ <br />$ <br />$ <br />Unit Price <br />400,000.00 <br />300,000.00 <br />1,300.00 <br />Amount <br />$ 400,000.00 <br />$ 300,000.00 <br />$ 67,600.00 <br />1 <br />2 <br />3 <br />4 <br />Pilot Hole Drilling <br />1,250 <br />FT <br />$ <br />200.00 <br />$ <br />+ $ <br />250,000.00 <br />8,000.00 <br />5 <br />Downhole Geophysical Surveying 1 LS <br />$ 8,000.00 <br />6A <br />Isolated Aquifer Zone Testing <br />6 <br />EA <br />$ <br />30,000.00 <br />$ <br />180,000.00 <br />6B <br />Collect, Deliver and Testing of <br />Zone Tests <br />6 <br />EA <br />$ <br />8,000.00 <br />$ <br />48,000.00 <br />7A <br />38-inch Dia. Upper Pilot Hole <br />Ream <br />450 <br />FT <br />$ <br />180.00 <br />$ <br />81,000.00 <br />7B <br />2R8-inch Dia. Lower Pilot Hole <br />Caliper Survey <br />g00 <br />1 <br />FT <br />LS <br />$ <br />$ <br />170.00 <br />4,000.00 <br />$ <br />136,000.00 <br />$ <br />4,000.00 <br />8A <br />8B <br />Magnetic Deviation Survey <br />1 <br />LS <br />$ <br />4,000.00 <br />$ <br />4,000.00 <br />9A <br />9B <br />18-inch ID Blank Casing <br />18-inch ID Blank Well Casing, <br />Cellar Pipe & End Cap <br />502 <br />170 <br />LF <br />LF <br />$ <br />$ <br />703.00 <br />587.00 <br />$ <br />$ <br />352,906.00 <br />99,790.00 <br />P-1 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.