My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - New Water Well Drilling at Washington Site
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Item 18 - New Water Well Drilling at Washington Site
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 11:38:44 AM
Creation date
7/12/2023 12:15:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
7/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 4 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 19-6423: Washington Well Improvements: <br />Well Drilling (Phase 1) Rebid <br />Project Item <br />Total <br />Construction Contract <br />$2,978,524.00 <br />Construction Administration, Inspection, Testing <br />$100,000.00 <br />Contingencies <br />$353,750.00 <br />TOTAL CONSTRUCTION DELIVERY COST <br />$3,432,274.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.