My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - New Water Well Drilling at Washington Site
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Item 18 - New Water Well Drilling at Washington Site
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 11:38:44 AM
Creation date
7/12/2023 12:15:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
7/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 19-6423 <br />WASHINGTON WELL IMPROVEMENTS <br />WELL DRILLING (PHASE 1) RE -BID <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />9C <br />18-inch ID Louvered Well Casing <br />600 <br />FT <br />$ 686.00 <br />$ 411,600.00 <br />9D <br />3-inch Dia. Gravel Feed Tube <br />422 <br />FT <br />$ 79.00 <br />$ 33,338.00 <br />9F <br />2-inch Dia. Pressure Transducer <br />Tube <br />452 <br />FT <br />$ 65.00 <br />$ 29,380.00 <br />9G <br />4-inch Dia. Camera Tube <br />440 <br />FT <br />$ 160.00 <br />$ 70,400.00 <br />9H <br />3-inch ID Air Vent Tube <br />4 <br />FT <br />$ 200.00 <br />$ 800.00 <br />10A <br />Pilot Hole Bottom Bentonite Seal <br />(Optional) <br />10 <br />FT <br />$ 55.00 <br />$ 550.00 <br />10B <br />Intra-Annular Seal (Optional) <br />20 <br />FT <br />$ 55.00 <br />$ 1,100.00 <br />11 <br />Gravel Pack <br />890 <br />FT <br />$ 100.00 <br />$ 89,000.00 <br />12 <br />Annular Grout Seal <br />395 <br />FT <br />$ 130.00 <br />$ 51,350.00 <br />13 <br />Well Casing Alignment Testing <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />14 <br />Standby Time <br />24 <br />HR <br />$ 400.00 <br />$ 9,600.00 <br />15 <br />Mechanical Well Development <br />120 <br />HR <br />$ 800.00 <br />$ 96,000.00 <br />16A <br />Chemical Development (12.5% <br />Chlorine Solution) <br />257 <br />GAL <br />$ 30.00 <br />$ 7,710.00 <br />16B <br />Chemical Development (Polymer <br />Dispersant) <br />32 <br />GAL <br />$ 200.00 <br />$ 6,400.00 <br />17 <br />Color Video Surveys <br />3 <br />EA <br />$ 2,000.00 <br />$ 6,000.00 <br />18A <br />Temporary Test Pump <br />I <br />LS <br />$ 30,000.00 <br />$ 30,000.00 <br />18B <br />Flow Meter Device <br />I <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />18C <br />Water Quality Meter <br />1 <br />LS <br />$ 15,000.00 <br />$ 15,000.00 <br />19 <br />Pumping Development <br />60 <br />HR <br />$ 600.00 <br />$ 36,000.00 <br />P-2 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.