My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Moving and Storage Services for the Main Library and Newhope Library
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
07/18/2023 Regular and Special HA
>
Item 23 - Moving and Storage Services for the Main Library and Newhope Library
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 10:54:19 AM
Creation date
7/12/2023 12:23:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
7/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />I Bookmobile Collection: Relocate Bookmobile collection of approximately 8,000 books <br />and audiovisual materials to the Newhope Library, 122 N. Newhope Street upon closure of Main <br />Library. <br />4. Shelving and Furniture: No shelving is included. However, Contractor shall be required to move <br />and store some miscellaneous furniture items, including a piano, several newer storage cabinets, a <br />large maker table and stools, and no more than 25 book carts. <br />5. Technology: Larger -sized equipment, including multifunction devices, self -check stations, security <br />gates, a laptop dispensing kiosk, a mobile device charging station, and two (2) arcade machines, <br />shall be included in the project scope. <br />6. Artwork and Fragile Items , The Main Library has several pieces of artwork, including a lame <br />painting, an antique vase, and a wall -mounted display case that must be specially packed and <br />stored. Contractor shall do the packing of all items designated as fragile. <br />7. Packing: Packing of the Library's circulating and non -circulating collections and materials will be <br />done by City staff, but the Contractor must provide all boxes. The Contractor shall also ensure that <br />boxes containing the collections are kept and stored in the sequence provided by staff to allow for <br />items to be reshelved in a timely manner. <br />8. Mandatory Pre -Bid Walkthrough: Staff will label all miscellaneous non -collection items, including <br />furniture and technology -related items that need to be moved. These items will be marked and visible <br />during the mandatory pre -bid walkthrough. <br />9. Schedule: <br />Deliver Packing <br />Library <br />Relocation to Storage <br />Storage Duration <br />Relocation to <br />Materials <br />Closure <br />and Newhope Library <br />Library <br />I\p2024A ril <br />ay 2024 <br />May 2024 <br />July 2024-Oct. 2025 <br />October 2025 <br />Note: Dates are tentative and are subject to change based on construction timeframes. <br />RFP No. 23-058 Library Moving and Storage Services Page 19 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.