My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PENALOZA, AZAEL
Clerk
>
Contracts / Agreements
>
P
>
PENALOZA, AZAEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 2:02:56 PM
Creation date
7/18/2023 2:01:34 PM
Metadata
Fields
Template:
Contracts
Company Name
PENALOZA, AZAEL
Contract #
N-2023-180
Agency
Community Development
Expiration Date
9/30/2023
Insurance Exp Date
7/5/2024
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />SCOPE OF WORK <br />The designer agrees to paint 3 murals that consist of one mural in the Family Lounge, which measures <br />approximately 150 SQFT, and the second mural will consist of two smaller murals on sidelights outside <br />of the counseling and conference room, which measures approximately 20-35 SQFT, and lastly a mural <br />across the Family Dorm Corridors, consisting of about 322 SQFT. <br />The design process includes 3 initial designs, one for each mural, to start. A round of revisions and lastly <br />application for the final design. Once revisions are approved, the final design will be started. The mural <br />installation will take approximately 21 days. The total cost of the mural is $20,000. This includes 3 <br />designs and revisions, all materials needed for installation, and lastly, Anti Graffiti Coating. <br />
The URL can be used to link to this page
Your browser does not support the video tag.