My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-06-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
FULL AGENDA PACKET_2021-06-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 4:03:00 PM
Creation date
8/9/2023 3:45:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/1/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page | 5 <br /> <br />MCFADDEN AVENUE PROTECTED BIKE LANE AND <br />BICYCLE BOULEVARD PROJECT <br />CITY OF SANTA ANA <br />Task 7.4 – 100% Final PS&E: Dokken will incorporate all City comments and concerns from the 90% <br />PS&E Submittal as well as the 90% Constructability Review and meet with City staff to review the <br />responses prior to making revisions. Once we have ensured that all final review comments have been <br />addressed to the satisfaction of all reviewers, the 100% Final PS&E for Bidding Package will be <br />submitted to the City with hard copies available as needed. <br />Task 7 Deliverables: 30% Concept Plans and Estimate; Responses to 30% Review Comments; 60% <br />PS&E; Responses to 60% Review Comments; 90% PS&E; Responses to 90% Review Comments; <br />100% Final PS&E for Bidding; Irrigation Calculations and Point of Connection Coordination <br />Task 8 – Bidding Support Services: Dokken will be available during the bidding phase of the project <br />to assist the City with providing responses to bidder inquiries and an analysis of the bids as needed. <br />Task 8 Deliverables: Response to Bidder Inquiries; Bidding Analysis <br />Task 9 – Construction Engineering Support (Optional Task): Dokken will provide a cost <br />proposal for construction engineering support services during the construction phase. <br />Task 9 Deliverables: Pre-Con Meeting Preparation; Response to Requests for Information; Submittal <br />Reviews; CCO Package Preparation; As-Built Plans <br />City Council 16 –40 6/1/2021
The URL can be used to link to this page
Your browser does not support the video tag.