My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-051 - Adopting Local CEQA Guidelines
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2023
>
2023-051 - Adopting Local CEQA Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 5:13:35 PM
Creation date
8/9/2023 5:11:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2023-051
Item #
22
Date
8/1/2023
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California En iroomental O ialitV Act (2023) ENVIRONMENTAL IMPACT REPORT <br />The Final EIR shall meet all requirements of Local Guidelines Section 7.18 and shall <br />consist of the Draft EIR or a revision of the Draft, a section containing either verbatim or in <br />summary the comments and recommendations received through the review and consultation <br />process, a list of persons, organizations and public agencies commenting on the Draft, and a section <br />containing the responses of the City to the significant environmental points raised in the review <br />and consultation process. <br />(Reference: State CEQA Guidelines, §§ 15089, 15132.) <br />7.32 RECIRCULATION WREN NEW INFORMATION IS ADDED TO EIR. <br />When significant new information is added to the EIR after notice and consultation but <br />before certification, the Lead Agency must recirculate the Draft EIR for another public review <br />period. The term "information" can include changes in the project or environmental setting as <br />well as additional data or other information. <br />New information is significant only when the EIR is changed in a way that would deprive <br />the public of a meaningful opportunity to comment upon a substantial adverse environmental effect <br />of a project or a feasible way to mitigate or avoid such an effect, including a feasible project <br />alternative, that the project proponents decline to implement. Recirculation is required, for <br />example, when: <br />(1) New information added to an EIR discloses: <br />(a) A new significant environmental impact resulting from the project or from <br />a new mitigation measure proposed to be implemented; or <br />(b) A significant increase in the severity of an environmental impact (unless <br />mitigation measures are also adopted that reduce the impact to a level of <br />insignificance); or <br />(c) A feasible project alternative or mitigation measure that clearly would <br />lessen the significant environmental impacts of the project, but which the <br />project proponents decline to adopt; or <br />(2) The Draft EIR is so fundamentally and basically inadequate and eonclusory in <br />nature that meaningful public review and comment were precluded. <br />Recirculation is not required when the new information added to the EIR merely clarifies <br />or amplifies or makes insignificant modifications in an adequate EIR. If the revision is limited to <br />a few chapters or portions of the EIR, the City as Lead Agency need only recirculate the chapters <br />or portions that have been modified. A decision to not recirculate an EIR must be supported by <br />substantial evidence in the record. <br />When the City determines to recirculate a Draft EIR, it shall give Notice of Recirculation <br />(Form "M") to every agency, person, or organization that commented on the prior Draft EIR. The <br />Notice of Recirculation must indicate whether new comments must be submitted and whether the <br />City has exercised its discretion to require reviewers to limit their comments to the revised chapters <br />or portions of the recirculated EIR. The City shall also consult again with those persons contacted <br />pursuant to Local Guidelines Section 7.25 before certifying the EIR When the EIR is substantially <br />2023 City of Santa Ana Local Guidelines 7-30 CBest Best & Krieger LLP <br />
The URL can be used to link to this page
Your browser does not support the video tag.