My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-051 - Adopting Local CEQA Guidelines
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2023
>
2023-051 - Adopting Local CEQA Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 5:13:35 PM
Creation date
8/9/2023 5:11:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2023-051
Item #
22
Date
8/1/2023
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California E vimmnental Quality Act (2023) TYPES OF FIRS <br />When the Lead Agency cannot find that the subsequent project will have no additional <br />significant environmental effect and no new mitigation measures or alternatives will be required, <br />it must prepare either a Mitigated Negative Declaration or an EIR for the subsequent project. <br />(Reference: State CEQA Guidelines, § 15175.) <br />8.12 FOCUSED EIR. <br />A Focused EIR is an EIR for a subsequent project identified in a Master EIR. It may be <br />used only if the City finds that the Master EIR's analysis of cumulative, growth -inducing, and <br />irreversible significant environmental effects is adequate for the subsequent project. The Focused <br />EIR must incorporate by reference the Master EIR. <br />The Focused EIR must analyze additional significant environmental effects not addressed <br />in the Master EIR and any new mitigation measures or alternatives not included in the Master EIR. <br />"Additional significant effects on the environment" means those project -specific effects on the <br />environment that were not addressed as significant effects on the environment in the Master EIR. <br />The Focused EIR must also examine the following: <br />(a) Significant effects discussed in the Master EIR for which substantial new information <br />exists that shows those effects may be more significant than described in the Master EIR; <br />(b) Those mitigation measures found to be infeasible in the Master EIR for which substantial <br />new information exists that shows the effects may be more significant than described in <br />the Master EIR; and <br />(c) Those mitigation measures found to be infeasible in the Master EIR for which substantial <br />new information exists that shows those measures may now be feasible. <br />The Focused EIR need not examine the following effects: <br />(a) Those that were mitigated through Master EIR mitigation measures; or <br />(b) Those that were examined in the Master EIR in sufficient detail to allow project -specific <br />mitigation or for which mitigation was found to be the responsibility of another agency. <br />A Focused EIR may be prepared for a multifamily residential project not exceeding 100 <br />units or a mixed use residential project not exceeding 100,000 square feet even though the project <br />was not identified in a Master EIR, if the following conditions are met: <br />(a) The project is consistent with a general plan, specific plan, community plan, or zoning <br />ordinance for which an EIR was prepared within five (5) years of the Focused EIR's <br />certification; <br />(b) The project does not require the preparation of a Subsequent or Supplemental EIR; and <br />(c) The parcel is surrounded by immediately contiguous urban development, was previously <br />developed with urban uses, or is within one-half mile of a rail transit station. <br />A Focused EIR for these projects should be limited to potentially significant effects that <br />are project -specific and/or which substantial new information shows will be more significant than <br />2023 City of Santa Ana Local Guidelines 8-8 ®Best Best & Krieger LLP <br />
The URL can be used to link to this page
Your browser does not support the video tag.