Laserfiche WebLink
CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Warner Avenue between Oak Street and <br />Grand Avenue from 2 to 3 lanes in each direction. The project will <br />also include additional left turn lanes at Grand Avenue, bus pads, <br />raised medians, and a protected bike lane. <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical <br />Report identified the need for Warner Avenue to be widened to a six- <br />lane major arterial to meet MPAH requirements. The existing Average <br />Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The <br />proposed improvements will allow the segment to accommodate future <br />traffic volumes at a Level of Service A and increase operational <br />efficiency. <br />PROJECT TITLE: <br />Warner Ave Improvements: Phase 2 <br />- Oak to Grand <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 5,151,910 ------ <br />Right-Of-Way 1,410,130 ------ <br />TOTAL 6,562,040 ------ <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />M2 LOCAL FAIRSHARE 1,287,170 ------ <br />MEASURE M2 COMPETITIVE 4,331,030 ------ <br />RMRA SB1 500,000 ------ <br />TRANSP SYSTEM IMPRV <br />AREA <br />99,010 ------ <br />TSIA AREA E 204,830 ------ <br />TSIA AREA F 140,000 ------ <br />TOTAL 6,562,040 ------ <br />20-Jun-2023