Laserfiche WebLink
EXHIBIT 4 <br />F�YMr <br />SUMMARY OF FEES AND CHARGES COMMON FOR NEW PROJECTS <br />COLLECTED BY THE PUBLIC WORKS AGENCY <br />EFFECTIVE JULY_ 1, 2023 — JUNE 30, 2024 <br />1. Transportation System Improvement Area (TSIA) Fee: <br />NON-RESIDENTIAL RESIDENTIAL <br />Area A - $5.15 I sq. ft. Area E - $2.01 1 sq. ft. (Applies only for projects with 5 or more dwelling units on the entire project.) <br />Area B - $1.81 1 sq. ft. Area F - $1.81 1 sq. ft. Single Family - $1.801 sq. ft, <br />Area C - $5.531 sq. ft. Multi -Family - $1.101 sq. ft. <br />Area D - $3.31 / sq. ft. <br />2. Transit Zoning Code Traffic Impact Mitigation Fair Share (Fee is in lieu of TSIA Fees): <br />NON-RESIDENTIAL <br />Retail - $ 9.11 I sq. ft. <br />Industrial $ 2.37 / sq. ft. <br />Commercial $ 3.641 sq. ft. <br />Civic $ 2,91 1 sq. ft. <br />RESIDENTIAL <br />Single Family $2,467.601 unit <br />Multi -Family $1,270.041 unit <br />High Rise Tower $ 856.56 1 unit <br />3. Harbor Specific Plan Mitigation Fair Share (Fee is in addition to TSIA Fees): <br />NON-RESIDENTIAL <br />RESIDENTIAL <br />Retail/Restaurant <br />$ 5,279.40 per 1,000 sq. ft. Single Family <br />All Other Uses <br />$1,098.14 per 1,000 sq. ft. Multi -Family <br />4. Transportation Corridor Fee: <br />Foothill/Eastern <br />San Joaquin Hills <br />Single Family <br />$4,601.001 unit <br />$4,942.00 / unit <br />Multi -Family <br />$2,683.001 unit <br />$2,883.001 unit <br />Non -Residential <br />$ 5.21 1 sq. ft. <br />$ 6.31 / sq. ft. <br />5. Drainage Assessment Fee (per acre): <br />Areal $ 8,715.00 Area 4 - $8,348.00 <br />Area 2 - $10,506.00 Area 5 - $9,511.00 <br />Area 3 $ 5,656.00 Area 6 - $9,353.00 <br />6. Sewer Connection Fee: $53.00 per plumbing fixture unit. <br />$ 850.00 / unit <br />$ 850.00 / unit <br />7. Orange County Sanitation District Fee: See OCSD Fee Schedule attached. <br />8. Street Work Permit Fee (Improvement & Utilities): $717.77 is the minimum; deposit may also be required. <br />(Residential repair minimum fee of $418.32) <br />Federal Clean Water protection Enterprise Fee — a surcharge of 26% is added to public improvement plan checks, sewer <br />lateral/water service, and street work permit fees. <br />9. Abandonment Processing: Summary $2,244.00; Non -Summary $6,733.00, per application. <br />For information as to which of the above fees apply to a specific project, pfease contact the Public Works Agency at (714) 647-5039. <br />udy Rosas <br />Deputy Public Works Director <br />City Engineer <br />