City of Santa Ana <br />Local Signal Synchronization Plan <br />The City's plan going forward to maintain its goals: <br />1. Near term: <br />(a) Maintain synchronization on all arterials in the City and OCTA RTSSP <br />(b) Complete synchronization timing for the following corridors: <br />• Edinger Ave Corridor <br />• Warner Ave Corridor <br />• MacArthur Blvd Corridor <br />• Tustin Ave Corridor <br />• Segerstrom Ave/ Dyer Rd Corridor <br />• 1St St Corridor <br />• Euclid St Corridor <br />(c) Complete Traffic Signal & ITS Master Plan <br />(d) Upgrade central business district (downtown) traffic signal controllers <br />2. Long Term: <br />(a) Continue to maintain synchronization on all arterials in the City and OCTA RTSSP <br />(b) Complete Citywide fiber communication network <br />(c) Upgrade all traffic signal controllers to Advance Traffic Controllers <br />(d) Retime arterials every 3 to 4 years or Citywide every 6 to 10 years <br />(e) Relocate Traffic Management Center to Ross Annex Building <br />(f) Complete implementation of Video detection Citywide <br />(g) Replace outdated traffic signal cabinets <br />(h) Upgrade signals to current standards for pedestrians and bicycles <br />(i) Implement the latest proven technology to monitor and improve traffic signal <br />operations where feasible <br />(j) Employ Advance Traffic Signal Performance Measures <br />(k) Prepare for Connected Vehicle technology <br />Page 5 2023 <br />