My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Main Street Rehabilitation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 15 - Main Street Rehabilitation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:30:20 PM
Creation date
8/10/2023 8:45:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6988 <br />MAIN STREET REHABILITATION FROM MACARTHUR BLVD TO DYER RD <br />ST. GERTRUDE PLACE AT ORANGE AVENUE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Furnish and Install Water Meter <br />4 <br />EA <br />$ <br />$ <br />Frame and Cover <br />1,048.00 <br />4,192.00 <br />15 <br />Adjust Manhole Frame and. Cover <br />16 <br />EA <br />$ <br />$ <br />1,048.00 <br />16,768.0 <br />16 <br />Adjust Manhole Frame and Cover <br />9 <br />EA <br />$ <br />$ <br />(O.C.S.D.) <br />1,720.00 <br />15,480.00 <br />17 <br />Adjust Manhole Frame and Cover <br />I <br />EA <br />$ <br />$ <br />(I.R.W.D.) <br />1,720.00 <br />1,720.00 <br />18 <br />Furnish and Install New #6 Pull <br />10 <br />EA <br />$ <br />$ <br />Box <br />1,240.00 <br />12,400.00 <br />19 <br />Adjust Water Vault Frame and <br />3 <br />EA <br />$ <br />$ <br />Cover <br />5,400.00 <br />16,200.00 <br />20 <br />Construct Parkway Culvert <br />3 <br />EA <br />$ <br />$ <br />(Type B) * <br />1,400.00 <br />4,200.00 <br />21 <br />Construct Parkway Culvert <br />1 <br />EA <br />$ <br />(Type A) <br />200.00 <br />8,200.00 <br />22 <br />Furnish and Install Traffic Loops <br />57 <br />EA <br />$ <br />$ <br />Type D 1' <br />511.00 <br />29,127.00 <br />23 <br />Furnish and Install Traffic Loops <br />118 <br />EA <br />$ <br />$ <br />Type E t <br />430.00 <br />50,740.00 <br />24 <br />Adjust Survey Monument Frame <br />3 <br />EA <br />$ <br />$ <br />and Cover <br />806.00 <br />2,418.00 <br />25 <br />Project Advertisement Sign <br />1 <br />EA <br />$ <br />$ <br />2,472.00 <br />2,472.00 <br />26 <br />Construction Permit <br />1 <br />LS <br />$9,708 <br />$9,708 <br />27 <br />Signing and Striping <br />I <br />LS <br />$ <br />$ <br />51,467.00 <br />51,467.00 <br />28 <br />Remove Existing Culvert (St. <br />1 <br />LS <br />$ <br />$ <br />Gertrude Pl. & Orange Ave.) <br />31,000.00 <br />31, 000.00 <br />29 <br />As -Built Plans <br />1 <br />LS <br />$5,000 <br />$5,000 <br />TOTAL BASE BID <br />$1,946,293.00 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />Bid <br />Rubberized Emulsion Aggregate <br />34 <br />TN <br />$ <br />$ <br />Alternative <br />Slurry (REAS) TYPE II <br />1,993.00 <br />67,762.00 <br />One <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.