My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Agreement for Thornton Park Lake Renovations
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 17 - Agreement for Thornton Park Lake Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:36:53 PM
Creation date
8/10/2023 8:45:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 22-151 <br />THORNTON PARK LAKE CIRCULATION STUDY & RENOVATIONS <br />SCOPE OF WORK <br />Introduction and Background: <br />The City of Santa Ana is seeking an environmental/aquatics engineering firm to provide a thorough <br />environmental study assessment, recommendations, develop a comprehensive rehabilitation plan and provide <br />design services which will result in the provision of Contract Documents for the "Thornton Lake Circulation <br />Study and Renovation " project. The plan should include but is not limited to plans to restore and rebalance the <br />lake's mechanical and biological systems, addressing user behavior and implementation of future operations <br />and maintenance. <br />Thornton Park is a 32.83-acre outdoor recreation and nature preservation neighborhood park situated near the <br />intersection of Segerstrom Ave and Bear St. The park is located at 1801 W. Segerstrom Avenue. The park offers <br />picnic areas, a man-made 2-acre lake with a running stream, ball diamonds, a fitness court, hike/exercise trails <br />and playground for tots and youth. Thornton Park is also the home of the George Upton All Access Park, which <br />is a barrier free playground. Thornton Lake was constructed in the 1970's. The functionality of the lake and <br />stream at the park are of high concern. A consultant is needed to do a preliminary research, inventory existing <br />lake components, provide analysis and recommendation options for optimal renovations. <br />The Scope of Work will involve an environmental/water engineering firm to conduct a thorough investigation <br />of the existing conditions at Thornton Lake. Then developing those investigations to aid into the preparation of <br />Contract Documents ("Plans & Specification") that address the mechanical and biological systems of Thornton <br />Lake including but not limited to aeration, skimmers, recirculation pumps and piping, vault, fountain, education <br />elements, biomedia, habitat creation and affected site work. <br />The project construction budget is $2.5 million. <br />Description of Work: <br />Perform an environmental assessment to a 2-acre man-made lake, with that assessment providing <br />recommendations, design engineering and contract documents to provide renovations to a lake. <br />Include Contractor's license requirements. <br />Consultant Responsibilities: <br />The Consultant's responsibilities shall consist of the following tasks: <br />Consultant is responsible for providing assessments and all design and engineering as required for all <br />components within the project scope of work. This includes but is not limited to survey, civil design, <br />architectural design, structural design, interior design, electrical engineering, mechanical and plumbing <br />engineering, etc. <br />Consultant shall provide review sets in .pdf format. <br />Final plans shall be provided in AutoCAD or MicroStation format, and .pdf format. <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.