My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Purchase of Commercial Diesel Generator Set for the City’s Corporate Yard
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/20/2023 Regular
>
Item 12 - Purchase of Commercial Diesel Generator Set for the City’s Corporate Yard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 8:50:50 AM
Creation date
8/10/2023 8:50:45 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Public Works Agency <br />Quotation: Q-145097-20230522-1026 <br />Item Description Qty <br />0 UL1008 3 - Cycle Withstand Ratings 10Transfer Mode - In - Phase Transition 10Poles - 3 (Solid Neutral)10Frequency - 60 Hz 10System - 3 Phase, 4-Wire (Solid or Switched Neutral)10Voltage - 480 Volts AC 10PC80 Control 10Integrated High Accuracy Power Quality Metering 10Genset Starting Battery-24VDC 10Standard Customer I/O 10Transfer Switch Warranty - 2 Year Comprehensive 10Packing - Wooden Crate 1 <br />AFTERTREATMENT <br />1 Freestanding Load bank 1 <br />2 JM Diesel Particulate Filter ( Shipped Loose )1 <br />Other Items <br />1 Service - start up & testing 1 <br />2 Freight & other charges 1 <br />TOTAL: $ 265,900.00 <br /> <br />OPTIONS: <br /> <br />ADDER: <br />• Steel Sound Attenuated Level 2 Enclosure w/ support frame $77,594 <br />• Spare parts: Air filter/oil filter/fuel filters/crankcase vent filters (4 Sets) $800 <br /> <br />Quote value does not include any tax. <br /> <br />EXCEPTIONS AND CLARIFICATIONS: <br /> <br />This quote was based on verbal requests and this package may or may not fit the owner’s application. However, if unforeseen design <br />changes are required, please notify us right away. <br />- <br />Offloading, installation, permits, fuel, and fuel for testing is to be provided by others. <br />- <br />All external exhaust piping by others. <br />- <br />All external fuel piping pumps by others. <br />- <br />Providing an open generator design with no housing,see adder for Steel Sound Attenuated Enclosure <br />- <br />Lead times subject to change. <br />- <br />Aftertreatment installed by others. <br /> <br />LEAD TIME: <br /> <br />Please note the following: The current lead time on the Generator is 41-62 weeks after approved submittals. <br />- <br />Please note the following: The current lead time on the ATS is 9-11 weeks after approved submittals. <br /> <br />Please feel free to contact me if you require any additional information; or if you have any further questions or concerns that I may be of <br />assistance with. <br /> <br />Thank you for choosing Cummins. <br /> <br />Submitted by: <br /> <br />Quotation: Q-145097-20230522-1026 <br /> <br />Page 2 of 8 <br />EXHIBIT 1
The URL can be used to link to this page
Your browser does not support the video tag.