My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Campesino Park, Memorial Park, and Madison Park Restroom Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 25 - Campesino Park, Memorial Park, and Madison Park Restroom Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:38:21 AM
Creation date
8/10/2023 9:38:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 25 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />June 6, 2023 <br />TOPIC: Campesino Park, Memorial Park, and Madison Park Restroom Projects <br />AGENDA TITLE <br />Approve Change Order and Revised Project Cost Analysis for an Existing Construction <br />Contract with iBuild Spectrum, Inc., for a Total Project Delivery Cost of $1,740,000, for <br />the Campesino Park, Memorial Park, and Madison Park Restrooms ( Project Nos. 21- <br />7533, 21-7534, 21-7535) (Non-General Fund) (Revive Santa Ana Program) <br />RECOMMENDED ACTION <br />Authorize the City Manager to approve Change Orders and revise the Project Cost <br />Analysis to reflect a transfer of savings from construction administration and inspection <br />to contingency in an amount of $33,898, with a total Project Delivery Cost of <br />$1,740,000. <br />DISCUSSION <br />On September 21, 2021, the City Council authorized the awarding of a contract to iBuild <br />Spectrum, Inc. for the Campesino Park, Memorial Park, and Madison Park restroom <br />projects, which encompasses contingency and construction administration. The <br />estimated total project delivery cost is $1,640,000. The project scope entails <br />demolishing the existing restroom buildings, installing new pre-fabricated restroom <br />buildings, and implementing certain site improvements to ensure an accessible path of <br />travel to these facilities. <br />Subsequently, on December 20, 2022, the City Council approved an increase in the <br />contract amount and total project funding by $100,000 to address additional repairs <br />necessitated by vandalism. <br />During construction, significant vandalism occurred at all three park sites. At Madison <br />Park specifically, the vandalism has taken a toll on the project’s scope as electrical <br />panels and electrical work was damaged. In order to complete the scope of work and <br />repair all damaged areas, the City requested that the contractor perform additional <br />repairs to electrical conduit runs and electrical panels. <br />To perform these vandalism related repairs and capitalize on the existing favorable <br />pricing of the existing contract with iBuild Spectrum, Inc., staff recommends approving <br />Construction Contract Change Orders (Exhibit 1), as allowed by the contract
The URL can be used to link to this page
Your browser does not support the video tag.