My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Pedestrian and Mobility Improvements Phase I
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 26 - Pedestrian and Mobility Improvements Phase I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:19:47 PM
Creation date
8/10/2023 9:38:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CITY OF SANTA ANA ADDENDUM No.: 1 <br />PROPOSAL <br />PROJECT NO.: 22-1405 <br />PEDESTRIAN AND MOBILITY IMPROVEMENTS PHASE I <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Towo Enterprise Inc <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />fiunish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item I Description I Qty I Unit I Unit Price I Amount <br />1 <br />Unclassified Excavation* <br />150 <br />CY <br />$ 120.00 <br />$18,000.00 <br />2 <br />AC Pavement <br />21 <br />788 <br />TN $ 300.00 $ 6,300.00 <br />SF $ 15.00 $11 820.00 <br />3 <br />Construct PCC Sidewalk (T=4") <br />per C.O.S.A. Std. Plan 1104* <br />SF $ 35.00 $171,500.0( <br />LF $ 100.00 $ 51 200.00 <br />EA $ 2,500.00 $ 2,500.00 <br />4 <br />Construct PCC Curb Ramp* <br />4900 <br />512 <br />5 <br />Construct PCC Curb and Gutter <br />(Type A-2-6)* <br />6 <br />Adjust Manhole Frame and Cover <br />1 <br />to Grade <br />1 <br />EA $ 1,500.00 $ 1,500.00 <br />7 <br />Adjust Water Valve Frame and <br />Cover to Grade_ <br />_ <br />8 <br />Construct Color Stamped <br />50 <br />SF $ 100.00 $ 5,000.00 <br />Concrete including rebar (T=8") <br />Construct PCC Modified Rolled <br />70 <br />9 <br />LF <br />$ 100.00 $ 7,000.00 <br />Curb and Gutter <br />1 <br />10 <br />Signing and Striping <br />LS <br />$ 10,000.00 $10,000.00 <br />11 <br />Furnish & Install Complete <br />Functioning Carmanah RRFB <br />LS <br />$ 20,000.00 $20,000.00 <br />1 <br />Project AdvertisingSign(s) <br />As -Built Plans <br />2 <br />12 <br />EA <br />LS <br />$ 1,500.00 $ 3,000.00 <br />$5,000 $ 5,000.00 <br />13 <br />1 <br />P-1 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.