Laserfiche WebLink
<br />EXHIBIT 4 <br />CITY OF SANTA ANA FY 22/23 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Alley Improvement Program This project will provide for the removal of existing <br />damaged pavement and reconstruction with Portland <br />Cement Concrete (PCC) for alleys citywide. <br />The Citywide network of Portland Cement Concrete <br />(PCC) and asphalt alleys is in extreme state of <br />deterioration with the presence of numerous potholes, <br />cracking, spalling, and uplifting. PCC pavement will <br />eliminate the drainage problems associated with the <br />asphalt pavement and provide a longer life for the alleys. <br />PROJECT CATEGORY: <br />Street Improvements <br />Alley Rehabilitation <br />LOCATION MAP <br />PROJECT COSTS FY 22/23 <br />$3,389,000 <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />Construction <br />Engineering $111,000 <br />TOTAL $3,500,000 <br />SOURCE OF FUNDS FY 23/24 <br />$3,500,000 <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29CITY WIDE <br />General Fund <br />TOTAL $3,500,000 <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Agency CIP Engineering Jason Gabriel, Principal Civil Engineer 18-May-2023 <br />- 1 -