Laserfiche WebLink
V. FEE PROPOSAL: <br />In addition to Section IV.13.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured to <br />correspond to the above mentioned tasks as follows: <br />Main Library Renovation <br />Task 1: Constructability Review <br />- Subtasks <br />Task 2: Construction Management and Inspection Services <br />- Subtasks <br />Total Fee: <br />Newhope Library Renovation <br />Task 1: Construction Management and Inspection Services <br />- Subtasks <br />Total Fee: <br />Delhi Center Library Branch <br />Task 1: Construction Management and Inspection Services <br />- Subtasks <br />Total Fee: <br />Outdoor Library at Jerome Park <br />Task 1: Construction Management and Inspection Services <br />- Subtasks <br />Total Fee: <br />Additional Services — All Proiects <br />Task 1: Total Project Schedule <br />Total Fee: <br />Fee schedule for each task should include an hourly breakdown that corresponds to the task total. <br />City Responsibilities <br />The City will provide information in its possession relevant to the preparation of the required information <br />in the RFP. The City will provide only the staff assistance and the documentation specifically in referred to <br />herein. <br />• Furnish scope of work and provide general direction as needed for the assigned project <br />City of Santa Ana RFP 22-173A <br />Page Al-15 <br />