My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:55 PM
Creation date
8/10/2023 9:41:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
35
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . STATEMENT OF QUALIFICATIONS <br />GRIFFIN STRUCTURES 1 21 <br />Yorba Linda Library & Cultural Arts Center <br />YORBA LINDA. CA <br />The two-story 45,000 SF Library and 13,500 SF Cultural Arts Center, completed July <br />of 2020, are centered in the downtown area of Yorba Linda. The library features play <br />areas, collections and story time space, study and community rooms, classrooms, and <br />retail store. The Arts Center houses a 250-seat black box theater, art and dance studios, <br />and gallery display space. The campus -like is connected via central paseo with outdoor <br />plazas and open space. <br />Salinas El Gabilan Branch Library <br />SALINAS. CA <br />V` <br />onma,�, <br />�. . <br />Griffin served as the developer for this facility which was completed June of 2019 <br />and delivered via Public -Private Partnership (P3), provided for the design, financing, <br />construction, and delivery of the new library. Prior to final schematic design, Griffin / <br />Swinerton's management led to a fully constructed, equipped building with learning <br />spaces for children, teen and adults, community rooms, and a welcoming courtyard. <br />VALUE + SIZE <br />$52M 158,500 SF <br />RELEVANCY <br />Design -Bid -Build; Library; <br />Local Project; Public Project <br />CLIENT + CONTACT <br />City of Yorba Linda <br />Carrie Lixey <br />Library Director <br />(714) 777-2466 <br />carrie.lixey@ylpl.org <br />AWARDS <br />ASCE Outstanding; <br />Community Improvement <br />Award; ENR Best Cultural / <br />Worship Project; APWA BEST <br />Project; CPRS Excellence in <br />Design, Facility Design Award <br />VALUE + SIZE <br />$21M 121,000 SF <br />RELEVANCY <br />Library; Public Project <br />CLIENT + CONTACT <br />Cary Ann Siegfried <br />Former City of Salinas Chief <br />Librarian <br />(972) 721-2748 <br />csiegfried@cityofirving.org <br />AWARDS <br />Delivered $1M Under Budget; <br />ENR Best Project; IEDC <br />Excellence in Economic <br />Development; Silicon Valley <br />Business Journal's Structures <br />Awa rd <br />GRIFFIN <br />STRUCTURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.