My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 35 - Construction Management and Inspection Services for Santa Ana Public Library Capital Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:55 PM
Creation date
8/10/2023 9:41:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
35
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. SCOPE OF SERVICES & SCHEDULE <br />GRIFFIN STRUCTURES 1 29 <br />Final Payment: Griffin will review all conditions <br />of the project and will ensure that all <br />criteria are met prior to the execution of the <br />Contractor's final payment. <br />Final Delivery: Once complete, we will <br />deliver all project files, data, as-built's, and <br />documentation to the City for record purposes <br />INNOVATIVE APPROACHES TO <br />DELIVERING SERVICES <br />Griffin believes in a highly collaborative <br />approach that takes advantage of innovative <br />technology mixed with traditional in- <br />field experience. Griffin Structures strikes <br />the perfect balance between the latest <br />in technological advances like Building <br />Information Management (BIM) and <br />traditional construction knowledge through <br />extensive constructability reviews. We utilize <br />cloud -based document management systems <br />(Submittal Exchange) while also emphasizing <br />face to face dialogue and problem solving. <br />Griffin Structures can police the project to <br />ensure all objectives are met and contracts <br />enforced, while also encouraging and <br />supporting the success of all team members. <br />Additionally, Griffin is partnered with <br />OpenSpace, which provides an innovative <br />photographic documentation experience <br />similar to Google street view. Mounted <br />to a hard hat, this system can capture <br />comprehensive 360-degree photography <br />of the site wherever the wearer walks. Once <br />complete, the system is uploaded to a cloud - <br />based database that integrates the footage <br />with the plans and spec and allows the viewer <br />to see everything photographed overlayed <br />with the site plan and/or floor plan. The <br />system integrates with BIM and allows for a <br />split view of the BIM model overlaid with the <br />photographic documentation to allow for the <br />view to confirm if what is going up in the field <br />is consistent with the project documents. <br />In short, through our vast experience <br />both as developers and as project and <br />construction managers, we have developed <br />highly specialized tools and protocols that <br />successfully manage every aspect of a project. <br />SCHEDULE <br />Please refer to our separate sealed fee proposal <br />to view our proposed schedule. <br />GRIFFIN <br />STRUCTURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.