My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 49 - Second Reading: Amending City Manager’s Contracting Authority
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 49 - Second Reading: Amending City Manager’s Contracting Authority
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 9:51:15 AM
Creation date
8/10/2023 9:51:12 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
49
Date
6/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. NS-XXX <br />Page 6 of 8 <br /> <br />entered into only after compliance with the rules established by the purchasing manager, <br />which shall include the review of such alternative sources of supply or performance as <br />may be available in competition with one another and selection therefrom on the basis of <br />obtaining maximum quality at minimum costs: <br />(a) Purchases of materials, supplies, labor, and equipment whenever it shall appear <br />that there is only one (1) reasonably available source or where solicitation of <br />bids would for any reason be an idle act. <br />(b) Purchases of materials, supplies, labor, and equipment necessary for the <br />preservation of life, health or property, following the declaration of a state of <br />emergency or disaster in the city. A full written account of emerg ency <br />procurements made during the declared emergency or disaster shall be <br />submitted to the city council within thirty (30) days after their procurement. <br />(c) Situations where no bids are received or all bids are rejected and the city council <br />determines, upon the affirmative vote of at least two-thirds (⅔) of its members, <br />that the materials, supplies, labor or equipment can be obtained at a lower cost. <br />(d) Purchases from vendors whose names are on current established lists and have <br />been awarded the same type of purchase contract by a federal agency (including <br />the general services administration), a state agency, county, city or other public <br />agency after a competitive bidding process determined by the purchasing <br />manager to be substantially equivalent to that prescribed by this article. <br />(e) Contracts for services. <br />Section 7. Section 33-203 of Article VIII (Public Works Construction Rules and <br />Regulations) of Chapter 33 (Streets, Sidewalks and Public Works) of the Santa Ana <br />Municipal Code is hereby amended to read in its entirety as follows: <br />Sec. 33-203. Procurement of public works construction. <br />The following procedure shall apply to every contract for which final plans and <br />specifications are available in conformance with procurement rules defined in Article VI I <br />and Article VII.II of Chapter 2 of the Santa Ana Municipal Code : <br />(a) Notice inviting bids. Notice inviting bids shall include a general description of the <br />public works construction, the place to obtain the plans and specifications, and <br />the date, time, and place for opening bids. The notice shall be published in a <br />newspaper of general circulation in the city for at least two (2) days, the first of <br />which shall be at least ten (10) days before the date set for opening bids. The <br />city shall make a good faith effort to send a notice inviting bids to all businesses <br />engaged in providing labor and materials for such construction located within the <br />boundaries of the city. <br />(b) The bid. Included with the plans and specifications for a work of public works <br />construction shall be the following documents: Instructions to bidder, proposal, <br />bond samples and the contract. The bidder shall execute the proposal and <br />contract, and submit them sealed with at least a ten (10) per cent bid bond, <br />cashier's check or certified check.
The URL can be used to link to this page
Your browser does not support the video tag.