Laserfiche WebLink
EXHIBIT 5 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 23-6907: Local Street Preventative <br />Maintenance FY22-23 <br />Construction Contract <br />$ <br />2,954,000.00 <br />Contract Administration, Inspection and Testing <br />$ <br />443,100.00 <br />Contingencies <br />$ <br />443,100.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />3,840,200.00 <br />