Laserfiche WebLink
Organizational Chart <br />F=-- <br />co <br />4-0 <br />C� <br />co <br />m <br />4- <br />0 <br />>t <br />NUVIS <br />P. Cardoza, PLA <br />Principal in Charge <br />15 % Availability <br />NUVIS <br />T. Munoz, PLA <br />Project Manager <br />30% Availability <br />BKF Engineering <br />C. Rideout, PE <br />Sr. Civil Principal in Charge <br />20% Availability <br />B. Kirby, PE, QSD <br />Senior Civil PM <br />40% Availability <br />D. Thresh, PLS <br />Survey Manager <br />20% Availablity <br />R. Chung PE, QSD/P, CFM, ENV <br />SP, F. ASCE <br />Stormwater, BMP, WQMP <br />40% Availability <br />CD Design Group <br />D. Karjalla, EE <br />Staff Engineer <br />Availaility 50% <br />C. Karjala <br />Electrical PM <br />Availability 50% <br />ECORP Consulting Inc. <br />Freddie 01mas <br />Principal Env Planner <br />40% Availability <br />Lindsay Liegler <br />Assoc Env Planner <br />40% Availability <br />7 <br />