My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Agreements for On -Call Landscape Architectural Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 21 - Agreements for On -Call Landscape Architectural Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:02:32 PM
Creation date
8/10/2023 11:21:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to provide <br />On -Call Landscape Architectural Services — RFP No. 22-097 <br />Proposed Team <br />DEA has worked on numerous on -call or flexible <br />services contracts since our founding in 1976. <br />We understand that these types of contracts are <br />utilized to assist our clients during times when they <br />are unable to have their in-house staff perform on <br />projects due to too many projects and not enough staffing. <br />DEA's project manager and landscape architecture <br />team have experience delivering award -winning <br />parks for the City of Santa Ana <br />DEA further understands that projects issued as part of an on -call contract could involve partnering with other <br />firms or other disciplines to respond to the specific needs of a project. We regularly respond in this capacity, <br />whether teaming in-house with our staff, or by participating on other design teams to supplement their services <br />and abilities. DEA's team is flexible with overlapping capacity through subconsultants to further allow us to <br />draw from a greater base of knowledge and talent, should that become necessary. <br />For this contract, our team includes Heath Habig, PLA as project manager and Kim Rhodes, PLA as <br />principal in charge. Assisting them will be a team of landscape architects, park planners, designers, <br />irrigation specialists, civil engineers, and surveyors from DEA. <br />DEA knows that the nature of an on -call contract is that they are variable, requiring a broad-spectrum of <br />professional services for upcoming, unknown projects on indeterminate time frames. Part of the popularity of <br />these contracts is the ability to draw on any practice at a moment's notice and have confidence in the cost- <br />effectiveness and quality of the consultant's product. DEA is familiar with this type of work, managing nearly <br />100 on -call contracts firmwide annually. We enjoy the relationships that can develop over long-term contracts <br />such as these, and the variety of projects that may result. <br />As with any on -call services contracts, we understand that the workload will vary throughout the life of the <br />contract. We are committed to providing the necessary staff resources to assigned projects on an as -needed <br />basis. The current and projected obligations of key team members will be evaluated in comparison to the <br />potential demands of projects assigned by the City of Santa Ana. The schedules for projects assigned under <br />this contract will be incorporated with staff at the beginning of the contract and at monthly intervals, to avoid <br />workload conflicts and to allow proposed staff to be available to complete the projects. Our goal is to identify <br />potential workload conflicts before they occur and resolve them against the critical paths of our client's projects <br />to make certain staff are available when needed. <br />Memory Lane Park <br />Mariposa Park <br />4 1 March 15, 2023 1 David Evans and Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.