Laserfiche WebLink
V A <br />4 <br />shade structure <br />PREFERRED ALTERNATIVE with grill (18 <br />picnic tables, <br />DRAFT - 12.16.2022 approximate <br />entry plaza and capacity 100 <br />relocated basketball market spew peo pie) existing <br />courts concrete swal. restroorn <br />upgraded <br />skate Dark <br />20'x3O' <br />amphitheater <br />oriented with <br />mountain View <br />behind <br />bionetention <br />single new splash pad entry all ages playground associated w/ group picnic stairs fitness class multipurpose <br />picnic restroom plaza playground picnic area (open to all shade space field <br />tables & outd-or but in close proximity and structure with <br />shower visible from picnic area) red "tiLe roof 50 100 200 hierr <br />coordination with outside agencies to ensure project compliance and <br />permitting prior to the start of construction. <br />To gather feedback on project goals and community vision for the project, <br />PlaceWorks conducted an online survey that received over 800 responses. <br />The design team utilized this feedback to develop two conceptual design <br />alternatives focused on different themes but offering the same general <br />amenities. Additional outreach with community members and feedback <br />from City Council resulted in a preferred alternative that brings together <br />elements from each alternative into a cohesive layout. The preferred <br />alternative celebrates the City's history through interpretive elements <br />and highlights its natural assets, including orienting the amphitheater <br />with views of the surrounding mountains and integrating planting and <br />hardscape to effectively move water in swales and provide an aesthetically <br />appealing landscape feature. The playground and splash pad make use <br />of existing site topography to create a multi -tiered play space that also <br />references the surrounding mountains, which is one of the celebrated <br />features of living in Beaumont. <br />PlaceWorks is leading a team of engineers and product designers <br />and is also providing CEQA services to ensure the project is ready for <br />construction. The development of construction documents, plans, <br />specifications, and estimates is currently under way. <br />Return to Proposal page 1-20 <br />A-57 <br />