My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Agreements for On -Call Landscape Architectural Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 21 - Agreements for On -Call Landscape Architectural Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:02:32 PM
Creation date
8/10/2023 11:21:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AS, <br />Japanese Pavilion <br />Santa Ana, CA <br />Completion Date: 2020 <br />Project Size: .2 acres <br />Design Cost: ssi'soo <br />Construction Cost: $2SO,000 <br />Client Reference <br />Suzi Furjanic <br />Associate Park/Landscape Planner <br />City of Santa Ana <br />(714) 571-4241 <br />sfurjanic@santa-ana.org <br />Project Summary <br />The Japanese Teahouse, along with its quarter -acre Japanese themed garden landscape was <br />donated to the City of Santa Ana in 19SO through donations from the Orange County Japanese <br />American community. The Teahouse/Pavilion is located within the Plaza of the Sun —a centrally <br />located, high -use pedestrian plaza adjacent to City and County government buildings. <br />After 50 years of weathering and public use, the teahouse structure and the adjacent landscaped <br />garden were in serious need of refurbishment and re-clesign. Improvements include adding <br />accessible board form concrete ramps from the plaza level into the teahouse. Deteriorating wood <br />beams, columns, and roof framing were replaced. Overhead lighting was replaced with period - <br />appropriate, vandal proof fixtures. The low wood rail fencing was replaced around the perimeter <br />of the garden area. The garden landscape area was refurbished with cobble streambeds, <br />landscaping, and cherry trees that will blossom each spring. <br />Project Team <br />Principal: <br />Project Manager <br />Larry P. Ryan <br />Pamela Burton <br />hk <br />Community Inspired Spaces Q <br />,NIP <br />DESIGN <br />RJ M GROUP <br />12 1 City of Santa Ana - On -Call Landscape Architectural Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.