My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Agreements for On -Call Landscape Architectural Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 21 - Agreements for On -Call Landscape Architectural Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:02:32 PM
Creation date
8/10/2023 11:21:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r, 1 A. r� 14 <br />JL <br />Bell Gardens Aquatics Center <br />Bell Gardens, CA <br />Project Start/End Dates: Jan 2021 - In progress <br />Project Size: 2.1 Acres <br />Design Cost: $1.61VI <br />Construction Cost: $ 18M <br />Project Summary <br />I <br />Client Reference <br />Rozanne Adanto, <br />Director of Recreation & Community Services <br />City of Bell Gardens <br />phone: (S62) 806-76SO I email: RAdanto@bellgardens.org <br />Grissel Chavez <br />Public Works Director <br />email: gchavez@bellgardens.org <br />The Bell Gardens Aquatic Center located in Ford Park was built in 1959 and was forced to shut <br />down in 2017 due to failing infrastructure, several maintenance issues and non-compliance to <br />new building codes. The City of Bell Gardens solicited architectural design teams to renovate the <br />facility and bring up to code. RJM and their host of selected consultants won the project and are <br />currently in the process of turning this facility into a state-of-the-art aquatic center. <br />New programming includes new pool house, recreational and competitive swim programs, <br />water fitness, water safety as well as learning and education. Site amenities include a SO -meter <br />competition pool, therapy pool, splash pad, and waterslicle. Other amenities include cabana <br />areas, picnic areas, terraced lawn space, trees for shade, outdoor fireplace and seating areas, <br />spectator seating, covered dry land training areas, new landscape and perimeter fencing are also <br />included. Along with these improvements, the aquatic area has more than doubled in size to cater <br />to all the needs for the Community of Bell Gardens. <br />Project Team <br />Community Inspired Spaces Q <br />Principal: Larry Ryan RIF <br />DESIGN <br />Project Manager: Eric Chastain GROUP <br />Landscape Architect: Tyler Page RJ M <br />City of Santa Ana - On -Call Landscape Architectural Services 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.