Laserfiche WebLink
. . . . . . . . . . <br />MALL DOG PARK LARGE DOG PARK- PLAYGROUNDS PICNIC ZONE SOCCER FIELD/MULTI) !ASKETBALL COURTS PARKING LOT - <br />CONCRETE SIDEWALK IN 5' IDE SIDEWALK IN T 1 2-5 PLAY AREA WITH GROUP PICNIC USE AREA 2 FULL COURTS TWO-WAY CIRCULATION <br />THEPARK PARK SHADE SHADE BENCH SEATING 90 DEGREE PARKING <br />B NCH SEATING BENCH SEATING 5-12 PLAY AREA WITH STRUCTURE 16 REGULAR STALLS <br />SHADE TREES SHADE TREES SHADE GROUPBBO CIRCULATION PICNIC SHELTERS-� 2 ADA STALLS WITH 1 VAN <br />N TURALTURF NATURALTURF SECURITY LIGHTING AREA <br />DECOMPOSED GRANITE DECOMPOSED GRANITE SECURITY SET CONCRETE PICNIC TABLES/ B3Q ADA TALL <br />DOG %NKING DOG DRINKING LIGHTING SiDEWALK � STRUCTURES IN SECURITY LIGHTING <br />SECURITY PARK SECURITY REMOVABLE/ <br />FOUNTA NS FOUNTAINS SHADED FITNESS PICNIC TABLES LIGHTING PERMANENT BOULARDS <br />�V LINK CONNECTION SECURITY LIGHTING STATIONS BENCH SEATING FUTSAL FIELD <br />BIKE RACKS BENCH SEATING SHADE TREES <br />K <br />DOG PARK ZONE ;.'_.Al��/�FENCE- J SOCCER FIELD C CULATION BUFFER BERM CV LINK CONNECTION <br />rION SHADE STRUCTURE AT - WALL/FENCE OPEN PLAY I . IT WIDE -INI-Ll- BUFFER BERM MIKE RACKS <br />CENTER ALONG CONCRETE SIDEWALK ALONG THE <br />DOU BILE GATE AT RESIDENTIAL LOTS PICNIC SHELTERS 4 WI H REMOVABLE NEIGHBORHOOD <br />ENTRANCE 9 <br />FENCING SECURITY LIGHTING POL RDSORGATES SIDE <br />E PICNIC TABIRES / SBO ROVIDES ACCESS FOR LANDSCAPE <br />,* EMER SPICY VEHICLES SCREEPI <br />4 STRUCTU ES IN PARK SE UNITY LIGHTING TREES <br />BENCH SEATING /SHADE <br />CENTRAL PLAZA PARK SIGNAGE TREES <br />RESTROOM/STORAGE BUILDING OPPORTUNITY <br />UNTAN/BOTTLE <br />FILLER <br />DRINKING FO <br />BIKE RACKS <br />ACCE14T PAVING <br />I WELLS x <br />REE <br />DROP OFF ZONE <br />LUEL A A PARKING <br />PARAR Y LIGHT NG <br />SSECUR;TTY REMOVABLE BOULARDS <br />DREAM HOMES PARK, CATHEDRAL CITY <br />Project Description: In 2020, Verde Design provided <br />conceptual planning efforts for a 7.5 acre community park <br />for the City of Cathedral City along the seasonal Whitewater <br />River. The park will be developed with trail connections to <br />the region's master planned CV link trail, Coachella Valley's <br />alternative transportation route. The park design includes <br />a multi -use, natural grass open space area , futsal court, <br />a central plaza, restroom building, two covered play areas, <br />fitness stations, two basketball courts, dog park, picnic <br />shelters, picnic tables, walkways, benches and two parking <br />areas. Most recently, we were retained by the City to complete <br />the build -out of this project, and construction drawings are <br />currently under way and the park opening is scheduled for late <br />2023. <br />Client: City of Cathedral City <br />John Corella, Dir. of Engineering/ Public Works <br />68-700 Avenida Lalo Guerrero <br />Cathedral City, CA 92234 <br />760.770.0340 1 Jcorella@cathedralcity.gov <br />Services: Master planning, conceptual design, public <br />outreach, consensus building, and construction documents <br />Program: <br />• Natural grass open space/play area <br />• Shaded play areas and picnic areas <br />• Basketball courts and futsal field <br />- Fitness stations <br />• Restroom Building <br />• Large and small dog parks <br />• Perimeter walkways and security fencing <br />- Parking lots <br />Consultant PM: Chris Giannini <br />Size: 7.5 acres <br />Construction Cost: N/A (in design) <br />Schedule: Estimated completion late 2023 <br />Mjl� I <br />'N <br />r 74 <br />40� <br />A A. 'Ril�AT-117% <br />T <br />