My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:04:33 PM
Creation date
8/10/2023 11:29:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Wr <br />:A <br />f, References: Proposal shall include a listing of relevant projects with references for <br />three public entities for which Proposer has performed similar work within the past <br />five (5) years. <br />2. SCOPE OF SERVICES AND SCHEDULE: <br />Proposal shall include a Scope of Services and Schedule which details the work <br />phases to be completed, the tasks to be accomplished, the deliverables to be provided, <br />and the schedule / timeline to complete the project, based upon the requested Scope <br />of Work detailed in Attachment I of this RFP. <br />3. FEE PROPOSAL: <br />The fee proposal shall be submitted concurrently with the technical proposal, but in a <br />separately sealed envelope, clearly labeled as "Fee Proposal." This shall include the <br />firm's Standard Hourly Fee Schedule, a table outlining the tasks and team hourly <br />effort for each of the major tasks, and a Project Fee Schedule as outlined in the Scope <br />of Work. <br />The fee proposal will not be opened until the proposals have been evaluated by the <br />proposal selection committee. The City will select the consultant based on <br />qualifications, and then negotiate a contract price based on available funding. <br />4. CERTIFICATIONS: <br />The following forms shall be signed and included as part of the proposal submittal <br />package: <br />• Attachment 3-1: Non -Collusion Affidavit <br />• Attachment 3-2: Non -Lobbying Certification <br />• Attachment 3-3: Non -Discrimination Certification <br />IV. PROPOSAL REVIEW (CONSULTANT SELECTION) <br />A. EVALUATION AND RATING <br />The criteria for evaluating the proposals are specified in: <br />RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION. <br />B. SELECTION <br />The committee may interview the top ranking proposers. The City will recommend <br />award of the contract to the proposer who will provide the best value to the City. City <br />reserves the right to begin negotiations and enter into a contract without interview or <br />further discussions. <br />V. CONTRACT AWARD <br />A. REQUEST FOR COUNCIL ACTION <br />City of Santa Ana RFP <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.