My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 25 - Construction Engineering Services for San Lorenzo Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 5:04:33 PM
Creation date
8/10/2023 11:29:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTIER <br />EDUCATION <br />MBA, FlnanGe, University of <br />California, Irvine, Graduate <br />School of Management, <br />1998 <br />Graduate Studies. Civil <br />Engineering, Califomla State <br />University at Long Beach <br />B.A., Economics, University <br />of Southern California, !987 <br />B.A., Social Sciences, <br />University of Southern <br />California, 1987 <br />LICENSES I <br />CERTIFICATIONS <br />General Engineering <br />Contractor, State of <br />California, Class A 716863 <br />Registered Constriction <br />Inspector, ACIA: Division I <br />Engineering 5572 <br />YEARS WITN FIRM <br />31yea(s <br />AVAILABILITY <br />As-Noeded <br />Mark M. Butler, Jr. <br />Project Director <br />Professional Summary <br />Mr, Butler serves as Vice -President and Chief Financial Officer for Butler <br />Engineering. His primary d uties include functioning as the primary point of <br />contact between Butler and its clients; contract management, sub -consultant <br />contract mmagement. maintenance of Butler's project Information system; <br />development of the firm's field procedural manuals: and staff resource <br />management, Mr. Butler works closely with the field construction manageme nt <br />,staff to ensure all contract scope requirements are being fully Implemented, Mr. <br />Butier also serves as the Firm's contact between the field construction <br />management staff/client and the pro*t public outreach effort, when necessary. <br />He has been responsible for generating, distributing, and presenting to <br />numerous public boards and community associations dealing with the impact of <br />construction activity on the local community. <br />Project Experience <br />Project Director, Mid -Basin Injection: Centennial Park Project; Santa <br />Ana, CA; Orange County Water District (Est. Completion: 201 8)—The <br />Mid -Basin Injection project consists of the constrUCtiOn of the following: four <br />groundwater injection wells in below grade vaults; a monitoring well at the <br />Heritage Museum site; a purified recycled water injection supply pipeline <br />approximately 5,000 feet long that connects to the District's existing <br />Groundwater Replenishment System (GWRS) pipeline and crosses the Santa <br />Ana River; a backflush discharge pipeline approximately 4,000 feet long that <br />discharges to the Greenville -Banning Channel and Centennial Park Lake; <br />installation of submersible pumps within the four injection wells; replacement <br />of approximately 9.6 acres of paving within the Park; demolishing an existing <br />City of Santa Ana restroom facility; and constructing two new buildings with <br />shared City and District uses. Butier is coordinating closely with the City of <br />Santa Ari Santa Ana UnIf led School District, Heritage Museum, and <br />state and federal agencies, <br />Project Director, Edinger Avenue Wsll—Phase 11 Equipping Project; City <br />of Tustin, Public; Works (Estimated Completion: 2016; Value: <br />$4,103,650)—Butier is providing construction management and inspection <br />services for the Edinger Avenue Well - Phase 11 Equipping Project. <br />Construction of the buil0ing and equipping of the pump includes installation of <br />a 225 LF of 12-inch diameter CML ductile iron pipe discharge water line <br />connection to 'I 2-inch ductile iron watermain; installation of 162 LF of 1 �.inch <br />diameter C-905 drain line; connection to the existing storm drain,' placement <br />of new onsite sewer manhole; installation of 76 LF of 8-inch diameter SDR 26 <br />sewer lateral: and connection to existing OCSID sewer manhole. The scope of <br />work also includes the erection ol 2,376 SF of CMU block wall with a metal <br />roof building to enclose the well pump, electrical equipment and chlorine <br />room, The project is part of the City of Tustin's Water Services Division, <br />which is responsible for the production and safe delivery of domestic water to <br />more than 14,100 service connections through approximately 172 miles of <br />water mains, Butler staff coordinated with several agencies inrInding the City <br />of Tustin, City of Santa Ana, and Caltrans, <br />
The URL can be used to link to this page
Your browser does not support the video tag.