My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 5 - BID PHASE SERVICES <br />5.1 Bid Phase Services <br />Mark Thomas will support the city through the bidding process, providing the following: <br />Attendance at pre -bid meeting <br />Respond to inquiries <br />Assist in the preparation of contract addendums <br />Review of submitted bid documents and provide recommendations on for award of construction <br />contract <br />TASK 5 nF1 IVERARI ES: <br />Responses to inquiries <br />Contract addendums <br />Recommendations for award <br />TASK 6 - CONSTRUCTION PHASE SERVICES <br />6.1 Meetings <br />Mark Thomas will attend the pre -construction meeting as well as other construction meetings and field <br />reviews as necessary. <br />6.2 Requests for Information (RFIs) <br />Provide clarification of contract documents and responses to contractor RFIs to the City's construction <br />manager. Plans or details will be revised as necessary. <br />6.3 Shop Drawing/Submittal Review <br />Mark Thomas will review submittals and shop drawings as requested by the construction manager. The <br />review of shop drawings shall include staging and traffic control, contractor's submittals for substitutions, <br />construction contractor's alternative construction approval, and others as requested by the construction <br />manager. <br />6.4 Change Order Assistance <br />Consultant will review proposed change orders and make recommendations as requested by the <br />Construction Manager. This effort may include independent cost estimating and schedule impacts. <br />6.5 As -Built Preparation <br />Mark Thomas will incorporate as -built revisions clouded and noted in the revision block using contractor's <br />record red lines. It is assumed that the Contractor supplied red line drawings are a standalone document, <br />clearly showing all field changes, with no references to RFIs or submittals. <br />TASK b UELIVLKABLES: <br />Responses to RFI, Shop Drawings and Submittals <br />Plan Revisions, as necessary <br />Recommendations on change orders <br />As -Built Plans <br />MARK THOMAS <br />Page A-14 <br />ON -CALL ENGINEERING SERVICES <br />City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.