My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PSOMAS <br />Rates are valid through June 30, 2024 <br />Project Director/Principal-in-Charge ................ <br />$290 <br />Cultural Resources Manager ............................ <br />$175 <br />Contract Manager/Senior Project Manager ..... <br />$275 <br />Cultural Resources Technician ......................... <br />$105 <br />Project Manager 11 ........................................... <br />$250 <br />Biological Resources Manager ........................ <br />$234 <br />Project Manager I ............................................. <br />$215 <br />Regulatory Permitting Manager ....................... <br />$220 <br />Senior Project Engineer ................................... <br />$205 <br />Senior Restoration Ecologist ............................ <br />$196 <br />Project Engineer ............................................... <br />$190 <br />Senior Biologist ................................................. <br />$163 <br />Civil Engineering Designer III ........................... <br />$150 <br />Biologist ............................................................ <br />$145 <br />Civil Engineering Designer 11 ............................ <br />$140 <br />Senior GIS Analyst ........................................... <br />$167 <br />Civil Engineering Designer I ............................. <br />$130 <br />Technical Writer ................................................ <br />$128 <br />Design Engineer I ............................................. <br />$105 <br />Planner ............................................................. <br />$170 <br />Survey Senior Project Manager ....................... <br />$260 <br />Senior Resident Engineer ................................ <br />$225 <br />Survey Project Manager/Manager .................... <br />$210 <br />Resident Engineer 11 ........................................ <br />$205 <br />Survey Senior Project Surveyor, PILS ............... <br />$195 <br />Resident Engineer I .......................................... <br />$185 <br />Project Surveyor, PILS ....................................... <br />$190 <br />Senior Structures Representative .................... <br />$225 <br />Surveyor, PILS or LSIT ...................................... <br />$180 <br />Structures Representative 11 ............................ <br />$205 <br />Survey Technician ............................................ <br />$155 <br />Structures Representative I .............................. <br />$185 <br />GIS Manager ................................................... <br />$260 <br />Senior Construction Manager .......................... <br />$220 <br />GIS Technician ................................................. <br />$100 <br />Construction Manager 11 .................................. <br />$200 <br />Senior CAD Technician .................................... <br />$165 <br />Construction Manager I .................................... <br />$180 <br />CAD Technician ................................................ <br />$145 <br />Senior Inspector .............................................. <br />$200 <br />Land Use Entitlement Manager ....................... <br />$275 <br />Inspector ........................................................... <br />$185 <br />Plan Reviewer ................................................... <br />$190 <br />Scheduler ......................................................... <br />$170 <br />Permit Tech I .................................................... <br />$170 <br />Office Engineer ................................................. <br />$160 <br />Permit Tech 11 ................................................... <br />$150 <br />Labor Compliance ............................................ <br />$125 <br />ADA Compliance/Access Specialist ................. <br />$190 <br />Project Assistant/Administration ....................... <br />$125 <br />Senior Environmental Project Manager ........... <br />$245 <br />Engineering Assistant, Intern ............................ <br />$110 <br />Environmental Project Manager ....................... <br />$187 <br />Administrative Support ...................................... <br />$95 <br />Environmental Analyst ...................................... <br />$145 <br />Standard computer and technology costs are incorporated into these hourly rates, as well as direct <br />labor, overhead, fringe benefits and fee. <br />Rates include miscellaneous related costs: vehicle, cell phone, digital camera, and standard tools <br />and equipment. All other direct expenses will be billed at cost. <br />The above schedule is for straight time. Overtime for Construction Management/Inspection and <br />Surveying services will be charged at 135 percent of the regular hourly rate. Sundays and holidays <br />will be charged at 170 percent of the regular hourly rate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.