<br />Schedule/Timeline to Complete the Project
<br />10
<br />Task N 113111111 StIrt linkl
<br />Option A Schedule 113 days Tuefi/5/19 Man 11/12J
<br />PROJECT MANAGEMENT 0 day, Tue 6/5/18 Tue 6/5/19
<br />AGENCY & UTILITY COORDINATION 25 days T.e 615/18 Mon 7/9/18
<br />ENVIRONMENTAL COMPLIANCE AND PERMIT 45 days Tue 6/5/is Mon 8/6118
<br />PRELIMINARY ENGINEERING 25 days Tue 5/5/18 Mon 7/9/18
<br />Site Visit 2 days Tue 6/5/18 Wed 6/6/18
<br />Field Survey 10 day� Tue 6/5/18 Mon 6/18/111
<br />Geotechnical Investigation I D days Tue 6/5/18 Mon 6/18/18
<br />Preliminary Design Report 5 days Tue 6119/18 Mon 6/25/18
<br />City Review of Preliminary Design Report 10 days Tue 6/26/18 Men 7/9/18
<br />PLAN PREPARATION 70 days Tue 7110/18 Mon 10/15/1
<br />30% PI.r, nd Estimate 15 days Toe 7/10/19 Mon 7/3011fl
<br />City Review of 30% Construction Documents 10 days Tue 7/91/18 Mon 8/13/18
<br />60% Plans, 5peciftiltions and Estimate 15 days Tue 8/14/18 Mon 9/3/19
<br />City Review of 60% Construction Documents ED days Tue 9/4/18 Mon 9/17/18
<br />1013% Plans, Specifications and Estimate 10 days Tue 9/18/18 Mon 10/l/12
<br />City Review of 100% Ccinstruntbo Documents 10 days Tue 10/2/18 Mon 10/15/1
<br />CONSTRUCTION BIDDING PHASE SERVICES 20 days Tue 10/16/1E Mon 11/12/
<br />-PRIE-CONSTRUCTION MEETING AND JOB -SITE 0 days Men Mon
<br />MEETINGS 11/12/19 11/12/113
<br />-RESPOND TO RECLUESTS FOR INFORMATION AND 0 days Mon Mon
<br />SUBMITTALS 11/12118 11112/18
<br />'PREPARE RECORD DRAWINGS (AS-SUILTS) 0 days Mon 11/12/1 Mon 11/1213
<br />8 1, -as
<br />o
<br />0
<br />6/5
<br />1
<br />11112
<br />11/12
<br />1V12_
<br />2
<br />3
<br />4
<br />6
<br />8
<br />9
<br />10
<br />11
<br />12
<br />13
<br />14
<br />15
<br />16
<br />17
<br />is
<br />19
<br />20
<br />Project: Santa Ana On -Call
<br />Proposal, RFP No 17-083
<br />Option A Schedule
<br />T,i,k I ... aw S,M".y I F1 T.�k, I
<br />S,lk ... ......... 101 T,i� Fi 4
<br />miis,� D.,vt.ri, N.dE
<br />S,ry M1 Sry ftftp P�gl
<br />P"J"t S."'n, M.1 sarey M.1 pn,qn,s,
<br />Ir.1i. T.,k s ,Iy r
<br />Iti. Miln.iry Fini,h a,1, 3
<br />Page I
<br />ID
<br />Ta.k N...
<br />Option B Schedule
<br />PROJECT MANAGEMENT
<br />AGENCY & UTILITY COORDINATION
<br />ENVIRONMENTAL COMPLIANCE AND PERMIT
<br />PRELIMINARY ENGINEERING
<br />sitc, Visit
<br />Field Survey
<br />Geotechrical Investigation
<br />Preliminary DesIgn Report
<br />City Review of Preliminary Design Report
<br />PLAN PREPARATION
<br />30% Plans and Estimate
<br />City Review of 30% Construction Documents
<br />60% Plans, specifications and Estimate
<br />City Review of 60% Construction Documents
<br />100% Plans, SpecikotionS and Estimate
<br />City Review of 100% Construction Documents
<br />CONSTRUCTION BIDDING PHASE SERVICES
<br />-PRE-CONSTRUCTION MEETING AND JOB -SITE
<br />MEETINGS
<br />'RSSPONDTO REQUESTS FOR INFORMATION AND
<br />SUBMITTALS
<br />-PREPARE RECORD DRAWINGS (AS-BUILTS)
<br />JDurcrtiori
<br />130 days
<br />Od�ys
<br />75 d"�
<br />15 day,
<br />30 days
<br />2 d�y�
<br />15 days
<br />15 days
<br />5 day,
<br />10 days
<br />96 days
<br />20 day,
<br />10 days
<br />20 days
<br />10 days
<br />TO day,
<br />10 day,
<br />20 days
<br />Oday�
<br />Odl�ys
<br />0 days
<br />start Fii,i,h
<br />Tue 6/5/18 Mon IZ/3118
<br />T., 6/5/18 Tue 6/5118
<br />T 615/18 Mon 7/9/38
<br />Tue 6/5/18 Men 612S/18
<br />Tu. 615/16 Mo. 7116118
<br />T 615/18 Wed 615/18
<br />To. 6/5/18 Men 6/25118
<br />Toe 615/18 M.n 6/25/18
<br />Tua 6126/18 Men 712/18
<br />Toe 7/3/18 Mon 7116/18
<br />Tue 7117/ig Man ILILIS/18
<br />Tue 7117/19 Mon 8/13/11
<br />Tue 8/14/18 Mon 8/27J18
<br />Toe 8/28118 Mon 9/24jis
<br />Tu. 9/25118 Mon 10/8/18
<br />To, 10/9/18 Mon 10/22118
<br />T 10/23118 Mon 11/5118
<br />Tue 11/6118 Mon 12/3/18
<br />Mon 12/3/18 Mon 1213118
<br />Mon 12/3/19 Mon 12/3118
<br />Men 1213/18 Mon 12/3/18
<br />'3,8 M 13 A,,g '19 si,p " ` "" '_
<br />8 15��9 5 IZ1926 2 9 IsIl 10 7 LIL21 10 h ZL
<br />, Is
<br />1213
<br />1213
<br />12/3
<br />615
<br />3
<br />4
<br />5
<br />6
<br />7
<br />a
<br />9
<br />10
<br />11
<br />12
<br />13
<br />14
<br />is
<br />16
<br />17
<br />18
<br />19
<br />2U
<br />P�cjisct Santa Ana On -Call
<br />P eposiu, REP No 17-083
<br />Om!., 9 Schedule
<br />Twk I.o. 5y
<br />spil, 1.,k
<br />Wk.— D..],
<br />S.ly sy R.11�,
<br />Pj- s....ry ma1 Sry
<br />le,T,,k sl.rl,
<br />I.... mfl,e Firiih-.nly
<br />u,.- rii�
<br />E-A W 0
<br />D-dl
<br />pl�_,
<br />M�l prog,
<br />E
<br />3
<br />Page I
<br />Fee Proposal
<br />Per the City's Request for Proposal, the fee proposal has been uploaded to PlanetBids and submitted under separate sealed
<br />envelope.
<br />Comprehensive. Innovative. Trusted. Proposal for On -Call Engineering, 23
<br />RFP No. 23-030
<br />
|