My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X Engineering prepared construction documents for the design of approximately 2700 linear feet of an 18" <br />domestic water line beneath a partially constructed roadway, Chino Avenue. The design included removal of <br />an existing 16" domestic water line and replacement with an 18" line. Additionally, removal of a connection <br />between the existing water line and a separate domestic water line within a different pressure zone was <br />required. The project team coordinated closely with the Ontario Municipal Utility Company (OMUC) to ensure <br />minimal water shut offs and to provide design solutions that would allow for future extension. <br />X Engineering prepared the design for two additional water lines within Chino Avenue which include a 12" <br />domestic water line and an 8" recycled water line. An alternative alignment study was also prepared and will <br />be presented to OMUC in an effort to find a feasible alignment for the two water lines. The preferred alignment <br />will minimize and avoid impacts to existing physical structures, eliminate the need for excess right-of-way <br />acquisition, and maintain compliance with the Division of Drinking Water requirements. <br />EX. R/W <br />EX. <br />R/W <br />FUTURE <br />R/W <br />88' <br />44' <br />44' <br />FUTURE FINISHED SURFACE <br />EX. GROUND EX. FINISHED SURFACE <br />BY OTHERS <br />I EX. WALL <br />12' 32' <br />1 <br />1 32' <br />12' <br />EOP <br />5 <br />(±5') <br />EX 8' 6' 12' 6' <br />14' <br />6' 6' <br />SWLKT <br />EX. 8" Q&G /1 4.7 6' 'oo <br />4.83' FUTURE <br />8" C&G <br />EX. 12" DW <br />'8.25' <br />?QW <br />fEX.16" <br />TO BE REMOVED <br />FUTURE 16" RW <br />PROP. 18" DW 8.38 <br />t72"SD <br />12.88' <br />BY OTHERS <br />b <br />EX. <br />BY OTHERS <br />-EX.1 5" SS <br />CHINO AVENUE <br />rk� <br />SCALE: 1"=10' <br />FROM STA. 232+67.59 TO STA. ±247+92.46 <br />Underground wet utilities cross section in Chino Avenue <br />REFERENCE <br />AGENCY <br />City of Ontario, Engineering Department - Ontario Municipal Utility Company <br />DATES OF SERVICE <br />June 2019 - June 2020 <br />CONTACT <br />Jeff Krizek I Associate Engineer, Ontario Municipal Utility Company, 909.395.2697 <br />X ENGINEERING & CONSULTING, INC. 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.