My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X Engineering provided construction documents for widening of a frontage road adjacent to Centre City <br />Parkway in Escondido, CA. The scope of work included design of 700 feet of public storm drain system to <br />connect existing median inlets to a regional storm drain system; X designed a storm drain that was considered <br />the most efficient and least invasive to the relevant stakeholders. <br />Additionally, 600 linear feet of sidewalk improvements were required to be installed to strengthen the local <br />transit network. Overhead electrical lines were also required to be undergrounded along the frontage as part of <br />development activities. <br />Construction of improvements began in February 2022. X Engineering continues to provide construction and <br />design support for the project on an ongoing basis. <br />Storm drain installation <br />REFERENCE <br />EX. <br />EDGE OF <br />PAVEMENT <br />EX. 41 <br />EX. 35' CENTRE CITY PARKWAY <br />VARIES <br />EX. 18" <br />2CYC"' <br />WATER � <br />EX. WESTERLY <br />CURB LINE CONSTRUCTION EX PROP <br />S. ESCONDIDO CENTER LINE R/� R/W <br />44.5 , BLVD <br />±41' 1 1'R/W J <br />±6' EX. <br />IDEDICATIC� <br />MEDIAN <br />±20' <br />22' 5.5' <br />4.4' <br />'7 <br />±13 * 2' EX * <br />SWLK <br />PKWY <br />EX 50 <br />PAVEMENT <br />5 <br />TO REMAIN <br />P� MAY �7 <br />TO BE REMOVE <br />f4- --T <br />MIN. IF <br />2% <br />EX, 12" <br />WATE <br />�4GAS <br />LJ <br />�X EX, 10" <br />X. <br />FORCE SEWER <br />MAIN <br />ESCONDIDO BLVD <br />�A <br />FROM STA 101+67 TO STA 104+79 <br />STREET CLASSIFICATION: LOCAL COLLECTOR <br />APPLIED TRAFFIC INDEX (Tl)=-6 <br />NOTE: TRAFFIC INDEX PER CITY OF <br />ESCONDIDO STREET DESIGN STANDARDS <br />Snapshot of entire project site including frontage street Escondido Blvd <br />AGENCY <br />City of Escondido, Engineering Department <br />DATES OF SERVICE <br />February 2021 -April 2022 <br />CONTACT <br />Owen Tunnel I Assistant City Engineer, City of Escondido, 760.839.4651 <br />17 X ENGINEERING & CONSULTING, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.