My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mop—, _171� <br />City of Santa Ana I On -Call Engineering Services <br />RIFP NO.: 23-030 <br />Cost Estimating <br />Our in-house cost estimator is experienced in <br />supporting both new construction and complex <br />renovation projects, and possess extensive <br />knowledge of a variety of tenant improvement <br />types. Utilizing the latest in cost control methods, <br />IDS ensures clients' projects are well planned <br />and expertly executed. In the delivery of its cost <br />services, IDS provides reliable, accurate estimates <br />while meeting its client's most critical deadlines. <br />Sustainable Engineering <br />The firm's project approach begins with a <br />complete assessment of project requirements <br />to achieve a LEED certification or provide a <br />sustainable design without certification. To meet <br />the project requirements our team will investigate <br />all sustainability options including photovoltaic <br />solar system, commercial and residential fuel <br />cell systems, geothermal ground source heat <br />pump systems, low energy LED lighting products, <br />water conservation design solutions, day lighting <br />harvesting, low -flow plumbing fixtures and high <br />SEER air conditioning equipment. <br />Zero Net Energy (ZNE) <br />IDS' professional mechanical, electrical, and <br />plumbing engineers are experienced in Net Zero <br />Engineering. Our team seeks ways to improve <br />the efficiency of HVAC and electrical systems in <br />buildings and apply smart net -zero energy design <br />and strategies. <br />ADA Access Compliance <br />Our expert ADA (Americans with Disabilities Act) <br />team offers detailed ADA facility surveys and <br />preparation of Transitional Plans, plan reviews, <br />training, and product consulting on a regular basis <br />to healthcare facilities, large corporations, and <br />federal, state and local government clients. <br />I <br />City of Irvine, Trail Improvements Projects <br />Bidding and Construction Administration <br />Support <br />IDS has significant experience with providing <br />practical, cost effective, fast/efficient solutions and <br />high -quality construction documents and drawings <br />and significant experience in construction support <br />and on -site construction administration services <br />for public projects. <br />Building Information Modeling (BIM) <br />Building on decades of hands-on experience <br />in Building Information Modeling (BIM), IDS is <br />committed to creating value for our clients through <br />innovative and fully integrated design solutions. <br />IDS'BIM platform helps our multi -discipline design <br />and construction teams improve project efficiency <br />by optimizing performance and response - <br />time of visualizations and simulations to create <br />unprecedented data rich models. Our clients <br />are experiencing the benefits of BIM that extend <br />long past the completion of a project - including <br />improved constructability, better -performing <br />buildings and more efficient project delivery. They <br />have also included Construction cost savings, <br />Schedule compression and Energy reductions. <br />AA IDS GROUP <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.