Laserfiche WebLink
mop-, <br />City of Santa Ana I On -Call Engineering Services <br />RIFP NO.: 23-030 <br />Relevant Experience <br />Los Angeles World Airports, Infrastructure Improvement Projects I Los Angeles, CA <br />Los Angeles WorldAirports- Roadways, Utilities, and Enabling Projects <br />IDS is working with the prime consultant on street improvements <br />that serve the area adjacent to the proposed Los Angeles <br />International Airport (LAX) Consolidated Rental Car (ConRAC) <br />and surrounding facilities. This project is an important component <br />of the Los Angeles World Airports (LAWA) Landside Access <br />Modernization Program (LAMP). The roadway improvements <br />design will reduce congestion and enable passengers to <br />efficiently access LAX, provide direct connections from the local <br />highways to the ConRAC and surrounding facilities, and reduce <br />traffic impacts to local communities. The La Cienega Boulevard & <br />Century Boulevard intersection will be rehabilitated and restriped, <br />within existing curb limits, to improve traffic flow through the area. <br />Improvement include new traffic signal heads, poles, and mast <br />arms, the addition of audible pedestrian signals, loop detectors, <br />update of the regulatory signage to agree with the revised striping <br />configuration, and curb ramp and crosswalk redesign. <br />Los Angeles World Airports - Security and Gate Improvements <br />• Civil Engineering <br />• Street Rehabilitation <br />Improvements <br />0 Mechanical, Plumbing, and <br />Electrical Upgrades <br />0 Architecture <br />0 Re -striping reconfiguration <br />Coordination with multiple <br />agency and community <br />stakeholders <br />Engineering design for security improvements to the perimeter gates and posts at eight (8) LAWA and <br />Airport Police operated locations and three (3) tenant operated locations. <br />• Gates/Posts upgraded to include one set of K-1 2 (M50) certified crash gates (17 total) and controls <br />designed for installation along the perimeter of the airside or the landside approach. <br />• Relocation of gate arms to be outside the rolling gates such that the gate arm will be the first gate that <br />vehicles approach to prevent casual contact with rolling gates. <br />• Utility mapping <br />• LED lighting <br />• Upgraded cameras for each of the posts and gates, excluding tenant gates. <br />• Intercoms for security posts upgrades <br />0 Coordination with multiple stakeholders and community groups. <br />Los Angeles International Airport Infrastructure Upgrades <br />IDS working with the prime consultants for two critical infrastructure projects which service LAX: Airport <br />Police and tenant operated locations and the re-establishment of permanent power to a Shell Gas <br />Station for the 98th Street Duct Banks. <br />Key Staff: Adrian Anderson, Jason Wetterich, Nathan Kerstiens, Harry Nguyen, Victor Lopez, Jaime <br />Rosenbach, Darren Smith, Joyeuse Dufitumukiza, Manny Ocampo, John Silber, Shelley Sivak, and <br />Michael Reed <br />Project Dates: 2021 - On -going <br />Contract Amounts: $330,000 (street improvements) 1 $389,458 (security & gates) 1 $13,001 (Shell <br />Gas Station) <br />Client References: Christian Saad (Commercial Manager for ARUP on behalf of LAWA <br />for the Street Improvements and Infrastructure Upgrades) Phone: (310) 578-4400; Anthony <br />Kirby (Principal for ARUP on behalf of LAWA for the Security and Gate Improvements Project) <br />Phone: (310) 343-2616 1 Email: Anthony.Kirby@arup.com <br />AA IDS GROUP Page 15 <br />