My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 20 - Agreements for Capital Improvement Projects On -Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:53:21 PM
Creation date
8/10/2023 12:06:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
845
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 P w 1-1 71� <br />City of Santa Ana I On -Call Engineering Services <br />RFP NO.: 23-030 <br />City of Orange Water Division I Warehouse Relocation <br />Orange, California <br />_V1 <br />I <br />The IDS team is currently providing engineering <br />design services for the replacement and relocation <br />of the City of Orange Water Division warehouse. <br />The existing warehouse location is now home <br />to the City's new Fire Department Headquarters <br />located at 105 South Water Street. The warehouse <br />will be relocated to 1130 E. Almond Avenue. <br />0 Essential Service 0 Specifications <br />Facility <br />Structural <br />• Civil Engineering <br />and Electrical <br />• Land Surveying <br />Engineering, <br />Architectural <br />• Grading Plan <br />Design Services <br />• Vehicular <br />Cost Estimates <br />Circulation Plan <br />Construction <br />• Water Quality <br />Documents <br />Management <br />Report <br />Key Staff: Adrian Anderson, Jason Wetterich, <br />Joyeuse Dufitumukiza, Matthew Michnewich, Victor <br />Mercado, Bob Kramer, Manny Ocampo, John Silber, <br />and Song Brandner <br />Project Dates: 2020 - on -going <br />Contract Amount: $260,258 <br />Warehouse Key Elements: Client Reference: <br />0 5,000 sf building built on the southeast portion City of Orange <br />of the Water Division's existing yard on Jeannette Guereca, PE <br />E. Almond Avenue City of Orange <br />0 The covered structure over the outdoor Phone: (714) 744-5525 <br />materials for asphalt, backfill, gravel, and Email: jguereca@cityoforange.org <br />spoils will be in compliance with the National <br />Pollutant Discharge Elimination System <br />(NPDES) <br />* The covered structure will be designed to <br />address water pollution by regulation at the <br />point source and minimizing erosion runoff <br />0 nto the storm drain system, <br />AA IDS GROUP Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.